3
Drawings
4
Site plan Drawing that shows an interested party what the plans for developing land are Basically serves the same purpose as the floor plan for a house
5
Floor Plan Simple line drawing showing rooms and those seen from above
Walls, door ways, and windows are often drawn to scale
6
Elevation Drawing that shows the front door site of something
Architectural drawings the show how a building will look from specific angles
7
Foundation plan Plan view of a structure
Looks as if it were projected onto a horizontal plane and passed through the structure
8
Building section Show any portion of a building whether a single room, a group of rooms, a floor or a group of floors, that is within the limits of fire division
9
Roof plan To show the shape of the roof
Material and the type of underlayment are also specified on the roof plan Typically drawn on the same sheet as the exterior elevation
10
Exterior plan An exterior elevation drawing is analogous to a photo showing what each side of the house looks like from the outside Key information about the building heights
11
Process, Places & Stages
12
1#Inception Meeting the client Client briefing
13
2#Feasibility Analyze the necessity and demand Research on
Site Condition Planning Design Cost
14
3#Outline proposal Proposal of research
Further discussion Examples: design, technical problems, Adjustment on plans
15
$$$$$$$ COST $$$$$$$ Brah
16
4#Scheme design Engineer and Specialist done assessment
Final development of the brief Decision making for Client = Submission of all proposals
17
5#Detail design Full details design of the building
Complete cost checking of designs After this stage design shall not be changed
18
6#Production information
Preparation of information regarding on the building Example: Design, Schedules and Specifications Blueprint printed
19
7#Bil of quantities Contractor tender for project
Quotation from Contractors Quotation from Suppliers
20
8#Tender action LAM Form Contract With Quantity
LAM Form Contract Without Quantity Selection Contractors and Subcontractors
21
9#Project planning Arrangement of commencing work on site
Conditions of Contracts
22
10#Operation on Site Supervise the progress on site
Advise on insurance required Staged payments to ensure progression of works Resolving problems
23
11#Completion Testing, adjusting and correcting all components of the building Example: Disposal, Electricity, Water, Car Park Ventilation, Firefighting, Emergency Medical Rescue unit, etc. Apply for Certificate of Completion and Compliance
24
12#Feedback End user giving feedback
Did the main purpose on building this building work ? Maintenance
25
Examples
26
Burj Khalifa (Burj Dubai)
829.8m Free-standing structure Service elevator Elevator moving up and down Number of stories Outdoor observation deck Small footprint accommodate large amount of people and reduce carbon admissions Drive wind toward building-integrated turbines and absorb solar power Geothermal heating and radiant cooling systems as have deep foundation Cladding system to withstand extreme heat Wind vortices never get organized of different building shape Tuned mass damper to reduce wind’s action(will sway the opposite direction) 3.3million square feet Took around 6 years to finish Adrian Smith(Chief) Marshall Strabala George J.Efstathiou William F.Baker
27
Adrian Smith 19 August 1944 (71 years old) Most experience in the world Etc. Trump International Hotel & Tower in Chicago and Jin Mao Tower in Shanghai and many landmarks Unique problem : Wind tunnel,Special elements,Mitigation strategies Received 125 design awards Partnership with many other famous people Etc. Gordon Gill, Skidmore, Owings and Merrill (SOM) Honorary Doctorate of Letters Degree in 2013 from Texas A&M
28
Roles
29
Responsibilities
30
Examples of Professional Architect