Download presentation
Presentation is loading. Please wait.
Published bySophia Evans Modified over 8 years ago
1
BUILDING STRONG ® PORTLAND DISTRICT 1 The Dalles Dam Emergancy AWS Backup Water Supply P&S FFDRWG Meeting, 4 Feb. 2015 Pat Duyck Project Manager
2
BUILDING STRONG ® PORTLAND DISTRICT 2
3
BUILDING STRONG ® PORTLAND DISTRICT 3
4
BUILDING STRONG ® PORTLAND DISTRICT 4
5
BUILDING STRONG ® PORTLAND DISTRICT 5
6
BUILDING STRONG ® PORTLAND DISTRICT 6
7
BUILDING STRONG ® PORTLAND DISTRICT 7
8
BUILDING STRONG ® PORTLAND DISTRICT 8 The Dalles Dam Emergancy AWS Backup Water Supply Schedule: 90% P&S Review; - 2 Feb 2015 100% P&S Review; - 30 Mar 2015 Contract Award (Construction); ~ 15 Aug 2015 Notice to Proceed (Construction); ~ 30 Aug 2015 Start of 1 st In-Water-Work; - 1 Dec 2015 Start of 2 nd In-Water-Work; - 1 Dec 2016 * Tunnel likely will need to start prior to Dec. possibly ~ Oct. Cost: DDR estimates construction cost at ~$13.0 Million. Currently revising cost data based on more detailed design. ® ®
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.