Download presentation
Presentation is loading. Please wait.
Published byIrene Phelps Modified over 9 years ago
1
Copyright © 2012 Boeing. All rights reserved. Strategic Early Verification For Cost Optimization and Risk Mitigation AIAA CASE 2013 Track 2 Session 2 Chair - Alison Lauderbach Co-Chair – Jim Blohowiak
2
Copyright © 2012 Boeing. All rights reserved. Alison Lauderbach Boeing Test & Evaluation Enterprise Laboratory and Simulation Development Jim Blohowiak Boeing Commercial Airplanes Development & Test Strategic Early Verification For Cost Optimization and Risk Mitigation
3
Copyright © 2012 Boeing. All rights reserved. “Happy Hour” Session Informal Interactive Less Lecture / More Dialogue Interrogative Questions How is your team challenging traditional verification and validation methods? What collaboration techniques can you use to ensure integration? What enablers can your team use to leverage verification and validation methods early in the test value stream? Where are you investing to make Integrated Research and Testing roles stronger to help ensure earlier discovery and risk mitigation? Strategic Early Verification For Cost Optimization and Risk Mitigation
4
Steve Holt Associate Technical Fellow - Systems Engineering Boeing Commercial Airplanes Mostafa Rassaian Technical Fellow - Structures Boeing Research & Technology Stephen Helland Ground Test Project Manager NASA Aeronautics Test Program
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.