Download presentation
Presentation is loading. Please wait.
Published byClinton Peters Modified over 9 years ago
1
Pipe and station integration ALEX BITADZE CERN- European Organization for Nuclear Research ATLAS Experiment E-mail: Alexander.Bitadze@cern.ch Alexander.Bitadze@cern.ch Home institute: Department of Physics and Astronomy University of Glasgow Thermo-Siphon Workshop 6th of July EDMS Id: 1004110
2
ATLAS Cavern
3
USA15 / 3105 (Compressor Room) USA15 / 3105 (Compressor Room)
5
Pipes could be fixed to the ceiling with special supports
7
Critical Area Routing of pipes must be checked in place, to avoid sharp bending.
9
Level change From A1 to A2
20
Total Length of Pipes: ~185m ~177m Outer Diameter of Pipes: Inlet Line: 65mm Outlet Line: 65mm
21
Thank You For Your Attention A.BITADZE
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.