Installing a servo-stabilizer in Woodland Guest House A servo-stabilizer installed Woodland Guest House lighting load. Date: 24 th February 2012 Capacity: 30 KVA Company: Muskaan’s History: Servo was initially in line but after loading AC’s it was bye-passed. Load Analysis of connected load was done. Reason: Installing AC’s in Woodland-boys could result in the over-loading servo, hence resulting in a flash. 1
2
SLD of Previous Arrangement of Woodland Supply 2 Charged Bus-bar Bus-bar charged Boys lighting + geyser Girls lighting + geyser Servo-stabilizer
3
Load Analysis of Woodland Guest House ItemsNumberLoad (Watts)Total Load (Watts) TV181202160 Fan32752400 Tubelights32401280 Cooler161502400 Total Load 8240 Lighting load is under 30 KVA A new cable was dug in and geysers and AC’s would be fed by it. This cable would not be under Servo-stabilizer’s load. Now only the lighting load of Woodland would be fed under a stabilizer. Load Analysis 3
4
SLD of New Arrangement of Woodland Supply 4 Charged Bus-bar Bus-bar charged Boys lighting Girls lighting Servo-stabilizer Girls + Boys geyser/AC
5
Comparison on behalf of 3 Day Load Manager Study Consumption Before Stabilizer 52 Units/day Consumption After Stabilizer 47 Units/day Savings : 30INR per Day 930INR per Month 10,980INR per Year Savings Calculations 5