Presentation is loading. Please wait.

Presentation is loading. Please wait.

What we have now – the Pbar source 1 1/23/2013 J. Morgan.

Similar presentations


Presentation on theme: "What we have now – the Pbar source 1 1/23/2013 J. Morgan."— Presentation transcript:

1 What we have now – the Pbar source 1 1/23/2013 J. Morgan

2 2 R. Ray - Director's CD-1 ReviewR. Ray - Mu2e Collaboration Meeting Recycler Ring Delivery Ring Muon Campus AP-30 AP-10 AP-50 P1 - P2 - M1 M3 MI-8 Line 1/23/2013 The Muon Campus

3 Antiproton Source Beam lines A 120 GeV/c proton beam is transported to the Target Station via AP-1 every 2.2 seconds An 8.89 GeV/c negative secondary beam travels down AP-2 and is injected into the Debuncher 8.89 GeV/c antiprotons are bunch rotated and stochastically cooled in the Debuncher, then transferred to the Accumulator via the D/A line Antiprotons are accumulated over hours, then transferred to MI via the AP-3 and AP-1 lines 8.89 GeV/c protons can be “reverse injected” or sent in the reciprocal direction of the antiprotons for tune-up 31/23/2013J. Morgan

4 Muon Campus Configuration The Accumulator and D/A line are no longer needed and will be used for beamline components M1 is the new name for AP-1, apertures will be improved to accommodate the larger 8.89 GeV/c primary beam AP-2 will be renamed M2 and will be a dedicated beam line for g-2 The M3 line will connect to the Delivery Ring (Debuncher) in the D30 straight section Both the g-2 secondary beam and Mu2e proton beam will be transported to the Ring via M3 M2 and M3 will have a higher quadrupole density than AP-2 did (~4.4 m vs. ~13.0 m) for g-2 Extraction, both single turn for g-2 and resonant for Mu2e, are also in the D30 straight section The old injection region for AP-2 will become an abort for Mu2e and could be used for proton removal for g-2 The new extraction line will be called M4 The M5 line connects M4 to the g-2 Storage Ring 4 1/23/2013 J. Morgan M5

5 Repurposing Pbar J. Morgan5 Antiproton production Muon Campus 1/23/2013 M5


Download ppt "What we have now – the Pbar source 1 1/23/2013 J. Morgan."

Similar presentations


Ads by Google