Download presentation
Presentation is loading. Please wait.
Published byGilbert Edwards Modified over 9 years ago
1
STEP-1 Open the screw cap with some sharp pin point object. STEP-2 Unscrew all the screws with help of a “+” type screwdriver. STEP-3 Disengage all the connectors from their respective slots. SECONDARY HEATER FIXING IN THROUGH DRAINS OF FF-TITANIUM SERIES
2
STEP-4 Open the F-Louver and take it away. STEP-5 Open the screw in right side which holds the heater/ evaporator assembly in cabinet. STEP-6 Pull the tubes looping over the evaporator assembly outward.
3
STEP-7: Lift the evaporator assembly.STEP-8: Pull out the through drain. STEP-9: Pull out the through drain and clean properly So that Al-Foil heater stick properly.
4
STEP-10: Peel out the paper from secondary heater. STEP-11: Assemble the heater in though drain as shown in picture after cleaning with cloth
5
STEP-12 Put the Through Drain assembly back in its slot. STEP-13 Paste the harness in right corner and put the evaporator down in its initial position. STEP-14 Take out the connectors safely from behind of EPS covers only without damaging sleeves of harness.
6
STEP-15 Connect the heater connector in middle slot of male connector given in right upper corner. STEP-16 Re-adjust the tube loops on top of evaporator assembly. STEP-17 Fix the screws back to fix the evaporator assembly in cabinet.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.