Download presentation
Presentation is loading. Please wait.
Published byBuddy Arnold Modified over 8 years ago
1
Concerto II Green Solar Cities Salzburg
2
Stadtumbau Lehen – Green Solar Cities Increase the energy efficiency About 400 new appartments, Kindergarten, Hotel, offices and labors 2000m² thermal solar collectors with 200.000 l puffertank Development of an intelligent energy monitoring Total sustainable renovation Socio economic issues and participation Quality insurance and dissemination Several projects change the city district Lehen
3
Kopenhagen (Valby) and Salzburg Cooperations in technical and political questions Option area 1 Option area 2 New built area retrofit area
4
è 1) Demoprojects è 2) Research and innovative technologies è 3) Dissemination and Documentation è 4) Cooperations
5
1) Demo Projects Stadtwerk Lehen Wohnbauteil: Gswb, HÖ 290 social apartments, Kindergarten, Student dormitory, cafe, gallerie Building Phase: October 2009 – November 2011
8
Demo Projects Stadtwerk Lehen commercial area: Prisma Hotel, renovation high rised building, offices, seminar-rooms and labors, „Volkshochschule“, Restaurant in the Frey-Villa Building start: H3 und H4 late autumn 2011
10
Passivhaus Esshaverstraße „Die Salzburg“ finished Juni 2008 Monitoringphase Detailled registration of all energy needs and in 3 appartments inclusive himidity and windows. 1st heating periode with some problems Continue till spring 2012
12
Neue Mitte Lehen „Die Salzburg“ Finished in Nov 08 48 social appartments 140m² thermal solar plant
13
Neue Mitte Lehen
14
Siebenstätterstraße – Parklife “Die Salzburg” Former industrial area Senior residence with 90 Beds 32 apartments for elderly people, 56 social dwellings – building start march 2010 Finished in summer 2012
16
Renovation Lehner Hof: design phase Historical protected building Kuenburggasse: Thermal renovation finished Connected to district heating
17
Renovation Strubergasse: 22 houses with 483 apartments: Study for a total sustainable and energetic renovation
18
RTD - workinggroups 1.Energy – solar & micro net 2.Energy – PV & electro efficiency 3.Renovation Strubergassensiedlung 4.Urban areas, participation und Quartiersmanagement 5.Planning of the green areas 6. Intelligent Energy monitoring
19
Solar & micro net 2.000 m² thermal collector with integrated heat pump Steinbeis simulation and report finished
22
Intelligent E-Monitoring Aims: - optimise the heating systems - influence the user behavior Working group „intelligent E-Monitoring Recherche of existing systems 60 test appartments
23
Community action plan Local info point First activities with neighbours
24
Dissemination
26
4) Cooperation è Solarconferenz in Copenhagen Nov 07 è International Symposium Stadt im Umbau Salzburg Okt 08 è Excursion of a danish housing association to Salzburg Mai 09 è Partnermeeting in Kopenhagen Mai 09 è Excursion of 25 danish architects to Salzburg Sept 09 è Internat. Renovation Symposium in NL Okt 09 è Visite of a danish representative from ministry of environment to get know how about implemention of E-point system è Excursion of Salzburg Experts to Kopenhagen and Malmö July 2010 è Excursion of danish architcts to Lehen in Sept.11
27
Qualitätssicherung Steering group
28
Quality control Quality check in autumn 09
29
Thermografic controll
30
Thank you for your attention
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.