Presentation is loading. Please wait.

Presentation is loading. Please wait.

Dec ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Similar presentations


Presentation on theme: "Dec ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------"— Presentation transcript:

1 Dec --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Jan--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Feb--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Mar--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Apr--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- May--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Jun--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Jul--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Aug--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Sep--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Oct--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Nov------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Dec------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Integration in pots Testing (incl. cooling) beam ? Installation in zone Consolidate design produce drawings Geometrical precision test Mechanical components order CE07 parts fabricate special parts prepare pipework / feedthroughs (incl. leak test) fabricate interface card flanges fabricate pot hats (Vacuum Praha) follow-up / reception Tooling gluing tools bonding tools detector assembly tools pipework bending/testing tools Hybrid lamination Chip mounting/ bonding Testing Sensor mounting/ bonding Testing Detector assembly Metrology availability hybrid PCB/VFAT (tested) availability sensors (tested) availability interface card (tested) holiday period Test Results Thermo- mechanical prototype Full Integrated Module (10 planes + complete electronics). Extended lab tests. Beam test ? Preparation work area end of installation in tunnel Xmas closure conceptual tests Internal Review Temperature Cycling of thermomechanical prototype detector  pot insertion tool

2 Dec --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Jan--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Feb--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Mar--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Apr--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- May--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Jun--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Jul--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Aug--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Sep--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Oct--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Nov------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Dec------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Temperature Cycling of thermomechanical prototype Consolidate design produce drawings Geometrical precision test Mechanical components order CE07 parts fabricate special parts prepare pipework / feedthroughs (incl. leak test) fabricate interface card flanges fabricate pot hats (Vacuum Praha) follow-up / reception Tooling gluing tools bonding tools detector assembly tools pipework bending/testing tools Hybrid lamination Chip mounting/ bonding Testing Sensor mounting/ bonding Testing Detector assembly Metrology Integration in pots Testing (incl. cooling) beam ? availability hybrid PCB/VFAT (tested) availability sensors (tested) availability interface card (tested) Installation in zone holiday period Test Results Thermo- mechanical prototype Full Integrated Module (10 planes + complete electronics). Extended lab tests. Beam test ? Preparation work area end of access to underground areas X-mas closure conceptual tests DT2 D/T TOTEM Internal Review TOTEM Bondlab TOTEM DT2 D DT2 2T TOTEM DT2 T 2T TOTEM Bondlab TOTEM 2T TS/DEM DT2 D/T TOTEM detector  pot insertion tool 1D, 1T

3 Consolidate design produce drawings Internal Review optimize alignment pins optimize detector mounting optimize guidance blades optimize cooling pipe routing interface card flange Kapton cable, connectors drawings for tooling (gluing, bonding, assembly)

4 conceptual tests insertion procedure of detector assembly into pot (requires to build a transparent dummy pot)

5 provide components n x CE07 parts n x Kapton PCB n x Si sensors finalize tooling laminate Kapton on substrate  PCB glue Si sensor  decide on glue ! glue PCB on side bars using 3D-CMM assemble planes to module perform metrology test perform temperature cycling (-30 / + 50ºC, env. test chamber) redo metrology Geometrical precision test

6 provide components 10 x CE07 parts 10 x Kapton PCB 10 x VFAT chip set 10 x Si sensors motherboard readout system dummy pot DAQ system test under vacuum ?  cooling required ! assemble full module, with maximum precision (to be defined in detail) Lab tests (source ?) Beam test ? temperature cycling (env. test chamber) Full Integrated Module (10 planes + complete electronics). Extended lab tests. Beam test ?

7 semi clean area SCA (~50 m 2 ) temp. / humidity restrictions ? Not severe. safe storage compartments safe transport boxes protective and other equipment (gloves, masks, coats, alcohol, tools, …) test benches (VFAT, IV-curve, Roman Pot, cooling) organize logistics: TS-DEM  Bondlab  SCA  Bondlab  SCA … Preparation work area


Download ppt "Dec ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------"

Similar presentations


Ads by Google