Presentation is loading. Please wait.

Presentation is loading. Please wait.

Subject:Proposed Liaison from TSG-X to BBF Date: 21 August 2009 Source: Chair, FMOAHG Airvana Contact: Doug Knisely cdma2000® is the.

Similar presentations


Presentation on theme: "Subject:Proposed Liaison from TSG-X to BBF Date: 21 August 2009 Source: Chair, FMOAHG Airvana Contact: Doug Knisely cdma2000® is the."— Presentation transcript:

1 Subject:Proposed Liaison from TSG-X to BBF Date: 21 August 2009 Source: Chair, FMOAHG Airvana Contact: Doug Knisely dknisely@airvana.com cdma2000® is the trademark for the technical nomenclature for certain specifications and standards of the Organizational Partners (OPs) of 3GPP2. Airvana, Inc., grants a free, irrevocable license to 3GPP2 and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and an y modifications thereof in the creation of 3GPP2 publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even tho ugh it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or th e resulting Organizational Partner's standards publication. Airvana, Inc., is also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-dis criminatory terms and conditions for purpose of practicing an Organizational Partner’s standard which incorporates this contribution. This document has been prepared by Airvana, Inc., to assist the development of specifications by 3GPP2. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on Airvana, Inc. Airvana, Inc., specifically reserves the right to amend or modify the material contained herein and to any intellectual property of Airvana, Inc.,other than provided in the copyright statement above.

2 14 September 2009 1 Recommendations for TSG-X Approve Doug Knisely acting as liaison to BBF for ongoing discussions Approved the remainder of this contribution as a 3GPP2 liaison contribution to the BBF meeting week of 14 September 2009

3 14 September 2009 2 Subject:Overview of 3GPP2 cdma2000® Femtocell Management Architecture and Proposed Working Relationship with BBF Date: 21 August 2009 Source: Chair, FMOAHG Airvana Contact: Doug Knisely dknisely@airvana.com cdma2000® is the trademark for the technical nomenclature for certain specifications and standards of the Organizational Partners (OPs) of 3GPP2.

4 14 September 2009 3 Overview Quick overview of approved 3GPP2 femtocell management architecture 3GPP2 MO standardization process and liaison relationship with BBF Proposal for MO report format and TSG inputs Proposed workplan Proposed process for working with BBF Recommendations

5 14 September 2009 4 Background 3GPP2 began work on femtocell-related standardization in early 2007 Technical activities were initiated in all 3GPP2 TSGs in late 2007 –System requirements –Security aspects –Air interface (radio) enhancements –Support for legacy 1x circuit services –Packet data services for 1x and HRPD (EV-DO) Throughout 2008, extensive work has been done in all areas Publication expected in Q3-Q4 2009

6 14 September 2009 5 3GPP2 Femtocell Architecture – 1x Circuit

7 14 September 2009 6 3GPP2 Femtocell Architecture – Packet Data (1x+DO)

8 14 September 2009 7 Role of The TR-069 Standard in Femtocell Management (1) Broadband Forum TR-069 universally selected as the framework for femtocell management –Selected by 3GPP & 3GPP2 for femtocell management –Endorsed by Femto Forum Management architecture and TR-069 ACS are the backbone of the key femtocell operational and provisioning call flows in 3GPP and 3GPP2 –Discovery –Registration –Redirection to alternate SeGW, ACS, or Femto Gateway –Self-organizing network/auto-configuration –Location verification –Provisioning and radio parameter assignments are managed only by ACS –AAA and back-office interfaces are required only on ACS

9 14 September 2009 8 Proposed Femtocell Management Standardization Process Femto Forum 3GPP RAN3->SA5 3GPP2 TSG-X/A/C/S-> FMOAHG TR-196 Femto Mgmnt Objects Mgmnt Object Framework Broadband Forum 3GPP AI MO Contents (UMTS, LTE) 3GPP2 AI MO Contents (1x, EVDO) 3GPP Specific Procedures (Disc., etc.) 3GPP2 Specific Procedures (Disc., etc.) Mgmnt Object Framework TR-069 Framework

10 14 September 2009 9 Scope of Work for 3GPP2 Femto MOs Management Object contents –Attributes –Range of values –Hierarchical structure that is appropriate for 3GPP2 AIs –3GPP2 will document these in a new technical report X.R00xx –This will serve as input to BBF to drive the 3GPP2 AI extensions to TR-196 Definition of procedures that are required for the proper interworking between the FMS (TR-069 ACS) and the FAP(s) –Procedures for discovery, registration, location verification, provisioning, etc. –Sequences/high level call flows for those procedures –Any additional semantic rules for MOs –3GPP2 will document these in a new specification X.R00xx

11 14 September 2009 10 Proposed Format for Management Object Input to BBF from 3GPP2 FeatureParameter Range of ValuesWriteDescription Object DefaultReference

12 14 September 2009 11 Workplan, Process, and Recommendations

13 14 September 2009 12 Proposed Draft Workplan (1) Preliminary discussions with BBF indicates: –Tentative proposal to incorporate 3GPP2 AI MO extensions into a new version of TR-196 makes sense –Would like to receive inputs from 3GPP2 as early as possible –Prefer to receive preliminary draft of MO contents early –Final (extremely) stable version as a followup –Crude estimate is 6 months from final MO inputs to publication

14 14 September 2009 13 Proposed Draft Workplan (2) Initial proposal for 3GPP2 workplan: –June – Call for MO inputs within 3GPP2 –August – First draft of MO inputs –November – Harmonized draft of X.R00xx containing MOs baselined –November – Transmit X.R00xx to BBF as first draft –January 2010 – X.R00xx enters first pass V&V –January 2010 – Transmit final version of X.R00xx to BBF –March 2010 – X.R00xx enters TSG-X Re-V&V –~March 2010 – BBF Straw Ballot –June 2010 – X.R00xx published –~June 2010 – BBF Final Ballot completes

15 14 September 2009 14 Proposed Process for Working with BBF Complete establishment of liaison relationship (BBF and 3GPP2 Secretariat) –Correspondence 8 July 2009 –BBF “Collaboration” relationship –IPR policies –Establish document sharing rules –Meeting sponsorship and working rules for joint calls and/or meetings (e.g., who’s running the meeting under what rules and with which IPR policies) –Negotiate rules for comments provided to/from 3GPP2 from/to BBF Complete establishment of day-to-day working liaison relationship –Periodic leadership calls between BBF and 3GPP2 to coordinate (esp. after exchanges start occurring) –Procedures for submission of comments against BBF straw ballots, etc. –Re-use of text from each others’ specifications

16 14 September 2009 15 Recommendations Adopt proposed work process jointly (previous slide) Agree on intent to follow proposed workplan (previous slide) Agree that 3GPP2 femtocell MOs will be in a new version of TR-196 Identify points of contact –3GPP2 liaison contact: Douglas Knisely –BBF technical and management contacts?


Download ppt "Subject:Proposed Liaison from TSG-X to BBF Date: 21 August 2009 Source: Chair, FMOAHG Airvana Contact: Doug Knisely cdma2000® is the."

Similar presentations


Ads by Google