SPS point 3 New RF building LIU-SPS-200 MHz Power Upgrade April 19, 2011Eric Montesinos / CERN-BE-RF-SR
2
SPS 200 MHz RF power: some history The RF-SPS started up in 1976 with two accelerating cavities (technical specs were written in 1971) For the new role of the SPS as proton-antiproton collider, since 1980, there are four cavities operating @ 200 MHz in the SPS April 19, 2011 2 Eric Montesinos / CERN-BE-RF-SR 20102000 1976 TWC#1 / TX1 TWC#2 / TX2 19901980 1975 1978 TWC#3 / TX3 1979 TWC#4 / TX4 1980 TWC#1 / TX1+TX2 TWC#2 / TX3+TX4 TWC#3 / TX5+TX6 TWC#4 / TX7+TX8 RF amplifier 1 mW Coaxial transmission line 125 to 160 meters Accelerating cavity Terminating loads Configuration of one of the four 200 MHz power plant 1 MW
3
Sections and Cavity One section : 11 drift tubes A cavity is composed of sections of cavity One 4 sections cavity April 19, 2011 3 Eric Montesinos / CERN-BE-RF-SR
4
Cavities redistribution 2011 : 4 cavities 2 x 4 sections 2 x 5 sections + 3 spare sections 2018 : 6 cavities 2 x 4 sections 4 x 3 sections + 1 spare section April 19, 2011 4 Eric Montesinos / CERN-BE-RF-SR
5
2011 amplifiers Two ‘Siemens’ Amplifiers (2 x 1MW RF ~ 450 m2 + 100 m2) Two ‘Philips’ amplifiers (2 x 1 MW RF ~ 500 m2 + 200 m2) April 19, 2011 5 Eric Montesinos / CERN-BE-RF-SR
6
2018 : Proposed two new power amplifiers Two new power amplifiers will be build : 2 x 1.7 MW peak RF Efficiency ~ 50 % -> 2 x 3.4 MVA ~ 7 MVA peak April 19, 2011 6 Eric Montesinos / CERN-BE-RF-SR One line (input cavity ~120 to 180 m away) Drivers: 16 SSA 8 kW From Beam Control Final 16 Tubes 110 kW (g = 12 dB) 3 dB combiners and power loads plus 120 to 180 m Coaxial lines - 0.6 dB - 0.2 dB = - 0.8 dB Tetrodes = 1.4 MW + 0.8 dB = 1.7 MW / 16 = 110 kW 1/16 splitter
7
2018 : Proposed two new power amplifiers Could be : 2 x 1.7 MW Klystron 2 x 4 x 450 kW Diacrodes 2 x 8 x 225 kW IOTs 2 x 8 x 225 kW tetrodes Equivalent to ‘Siemens’ ~ 500 m2 + 200 m2 2 x 16 x 110 kW Tetrodes Equivalent to ‘Philips’ ~ 500 m2 + 200 m2 2 x 1800 x 1 kW SSA Equivalent to 10 x SOLEIL ~ 500 m2 + 200 m2 SOLEIL amplifiers April 19, 2011 7 Eric Montesinos / CERN-BE-RF-SR
8
New RF building Point 3 is the best area even if we need a new building New building between BA3 and BB3 in front of 929 RF workshop : Ground floor 20m x 25m = 500 m2 First floor, metallic: 10m x 25m = 250 m2 April 19, 2011 8 Eric Montesinos / CERN-BE-RF-SR RF workshop Siemens Philips 800 MHz Faraday Cage Damper ?
9
New RF building Amplifier study Tunnel integration New RF Building April 19, 2011 9 Eric Montesinos / CERN-BE-RF-SR RF amplifier 1 mW Coaxial transmission line 125 to 160 meters Accelerating cavity Terminating loads 1 MW New RF Building
10
Project estimates April 19, 2011Eric Montesinos / CERN-BE-RF-SR 10 ItemStaff FTE years Total price (FSU included) kCHF Building Civil Engineering (Michael Poehler) Basement (30 x 30) m 2 x 4000 CHF/m 2 First floor (15 x 30) m 2 x 2000 CHF/m 2 2.54’500 Building Ventilation (Mauro Nonis) based on Isolde last study 1.51’000 Electrical Network High Power (Joel Lahaye) Study, documentations, HV transformers 2 x 2 MVA, HV cubicles, HV cabling, HV accessories 1.5800
11
Draft schedule April 19, 2011Eric Montesinos / CERN-BE-RF-SR 11 Studies MS Install Build new hardware Year 4Year 3Year 2Year 1Year 5 Building Services RF : Building : 20172014 201320122011 20152016 2018 Year 6Year 7 Tendering Commissioning Studies and authorizations Cavity re-arrangement within a LS (>6 months)
12
Persons in charge April 19, 2011Eric Montesinos / CERN-BE-RF-SR 12 BE-RF : Eric BE-Space manager : Paula Civil Engineering: Natasha, Michael Integration: Yvon, Frédéric CV: Mauro, … EN: François, … Transport: ? … Safety: Enrico, Cristiana, … Fire detection, alarms: Christophe
13
April 19, 2011Eric Montesinos / CERN-BE-RF-SR 13 Thank you very much