Download presentation
Presentation is loading. Please wait.
Published byAmberlynn Dulcie Matthews Modified over 8 years ago
1
WG3 : Superconducting Linac Session H. Hayano, C. Pagani 10222010 IWLC2010 @ Geneva,Oct.2010 summary
2
WG3 session agenda (1) Industrialization of Cavity and Cryomodule Initiation of specification document, Production model of Cost effective and Risk mitigation, Reliable cost estimation towards TDR, Experience and Plans of industrialization : LHC, XFEL, US, Asia (2) Cryomodule Test Status and Plans (3) Cavity : long-term R&D (4) Joint with CFS: tunnel layout of mountainous site (5) Joint with NC-cavity: to seek common interest On going S1-Global test, PXFEL-cryomodule Plans of FNAL-CM and FLASH 9mA test R&D overview, LL-shape, RE-shape, Seamless-cavity, Dry-ice cleaning, New materials, Atomic-layer deposition Cryomodule and DRFS layout in tunnel cross-section SC cavity issues / NC structure study status
3
Industrialization
4
A. Yamamoto
9
Cryomodule Test
10
E. Kako
12
D. Kostin
13
Summary of PXFEL cryomodule test PXFEL1 PXFEL2 PXFEL3 Three Pre-series Cryomodule were tested. Average gradient go beyond XFEL spec. One or two cavities degrease its gradient. Pick up from D. Kostin
14
B. Kephart
15
Cavity R&D
16
R. Geng
19
W. Singer
20
Joint Session
21
~900 mm Joint session with CFS: A. Enomoto
22
Joint session with NC-structure: W. Wuensch
23
END of Slide
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.