1
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire 1500m 2 CMS area in 867 destined for machine ra material handling. Basic CMS philosophy (discussed with SC): For maintenance of equipment exposed to beam in UXC (including activated material) 1 Concentrate activity at LHC Point 5, Cessy. For maintenance of non-activated equipment NOT exposed to beam in UXC or elsewhere, ….and for upgrade. Concentrate activity in 186 (Meyrin) & 904 (Prevessin) Concentration ensures that CERN staff TSO and support technicians can be assigned to each of these sites. Key infrastructure will be included in CCC monitoring task. 1 Will still need access to common specialist ra electronic workshops which are planned for Meyrin. ( plus mechanical ra workshop if higher than class C needed)
2
Upgrade week Apr10 AB From Guy Duthion 22.04.2010
3
Upgrade week Apr10 AB Temp & RH stability at the ISR: ideal for RPC From Stefano Colafranceschi 22.04.2010 Need to duplicate conditions in 904. Local environment enclosures feasible (eg around cosmic ray stand) but only as a refinement of generally stable conditions in the building. Request to CERN as host lab to consolidate Building 904 so that such conditions are Possible.
4
Upgrade week Apr10 AB CMS Gas Detector Labs - 904 Preparation of RE and CSC upgrade production sites CMS Gas Detector Labs - 904 Preparation of RE and CSC upgrade production sites Cooling: Total cooling power for the 904 estimated at 300kw - 200 kw to supply the racks - 100 kw for the remainder of 904 to include the HVAC, CSC and RPC production lines - Minimum cooling plant, 2 groups in parallel. - Preference 3 groups in parallel 2 operational + 1 spare for redundancy facilitating maintenance and guaranteed cooling supplies. - Incorporate supervision and control circuits. Recuperation from P5 being looked at From D.Hay, A.Gaddi C.Martel 22.04.2010
5
Upgrade week Apr10 AB Budget estimates:building & lab infrastructure
6
Upgrade week Apr10 AB SX5: OSC intended layout ECAL/HCAL/CASTOR TOTEM 20 x 17m Class C ra Pixel & BCM(lower) Vis centre (upper) Workshop (incl users) HCAL (upper) Workshop (ra) Class C CSC/DT/RPC 3 areas 10 x 15m flexible Crane staging Green Barrack DAQ,TK & MU TOTEM Infra & Logistics 25m x 20m Ready-use tooling Gas E-mech w/s beampipe PM56 shaft Future Offices Access controlled area basic infrastructure, offices: CERN: 2000k (update for GS SX5/SHL project) common systems and facilities: M & O A: 1059k (endorsed by RRB-SG and RRB Apr 10) subdet specific: M & O B: 310k 4 phase planning, essential to complete phase 1 before the earliest plausible start-date for next long-shutdown Visitor centre upper floor 4 year project : 2.8 M CHF, spend profile concentrated in 2010,11 Lockers, washroom hand-foot monitors problem Prepared by CMS TC & EAM teams
7
Upgrade week Apr10 AB SX5 project Provisional acceptance of building permit: final decision in 3 months. SX5/SL53/SHL project is still targetted for completion end of 2011. “Walk-in” Visitor centre is a key feature Confident we can now go ahead and “empty” the Hall cataloguing near complete temporary storage at SX5 (“buche agricole” – permis?) long term storage SX5, 892 and 904 hangar Priority is the SHL 1’st floor – roof of the proposed pixel clean room GS ready to go ahead with this - seeking solution for cable gallery access Next priority is the access controlled zone and the initial rad workshop -first detailed estimate 159k …not far from 150k coarse guess.