1905 NW Thurman St Bridge
3
Project Location
4
Thurman St Bridge
5
1904 Oregonian Article
6
Balch Creek 160 ft span60 ft span
7
Portland’s Historic 1905 Thurman St. Bridge Oldest Bridge, National Register Eligible
8
Portland’s Antique Thurman St Bridge
9
Portland’s Handmade Thurman St Bridge
10
Two Lane Bridge plus sidewalks
11
Thurman St Bridge Structure Riveted Steel Floor Beam Timber Deck Planks Timber SidewalkTimber Stringers Steel Trusses
12
Sidewalk overheadRoadway Overhead Riveted Steel Floor Beam
13
Timber Stringers and Riveted Steel Beam in deteriorating condition
14
Pavement in Poor Condition
15
Timber Sidewalk in Poor Condition
16
Chain Link Rail in Ugly Condition Traffic Rail Substandard
17
Existing Water Line on Bridge serving Willamette Heights
18
Thurman Weight Restricted 40,000lbs; 60,000lbs.
19
Bridge Load Rating results Inadequate Timber Stringers Inadequate Riveted Steel Floor Beams Trusses are Adequate
20
Replace Members & Deck Keep Trusses & Towers Replace Deck & Superstructure
21
Replace Members & Deck
22
Bridge Repair Scope of Work Replace timber stringers with new steel wide flange members Replace riveted floor beam with new steel wide flange beam Replace timber deck with steel deck in-filled with asphalt Replace wood sidewalk Existing trusses satisfactory
23
New Bridge Superstructure
24
New Waterline New Traffic RailNew Pedestrian Rail New Slip Resist Sidewalk New Pavement
25
Bridge Closed During Construction. 6 - 9 months. Detour in effect.
27
Macleay Park Open during Construction
28
Funding Summary Local Highway Bridge Program Funding Federal Contribution$3,392,000.00 City Contribution (10.27%)$ 388,309.00 Total Project Funding$3,781,000.00