PDS4 Build 3b System Readiness PDS Management Council Face-to-Face Columbia, Maryland April 2-3, 2013 Sean Hardman
2
Topics Overviews Build 3a -Summary -Operational Deployment -RFA Status Build 3b -Summary -Planned Deployment -Search Service Status -Report Service Status Build 4a and Beyond Next Steps April 2-3, 2013PDS4 Build 3b System Readiness2
3
Overview Build 3a -Delivered on September 30, 2012 -Test and deployment to operations at the EN in occurred in October 2012 -Have been running side-by-side with PDS3 system -Deployed and exercised the software at many of the Nodes Build 3b -Delivered on March 31, 2013 -Test and deployment to operations at the EN to occur in April 2013 -Deployment to the Nodes commencing in late April 2013 April 2-3, 2013PDS4 Build 3b System Readiness3
4
Build 3a Summary Validate software in place supporting validation of PDS4 labels using XML Schema and Schematron files. Initial data access and transform software in place for working with PDS4 data. Harvest and Registry software in place to support EN and Node registration of PDS3 and PDS4 data. Search software in place supporting catalog- level search. Report software in place waiting to be populated with web logs. April 2-3, 2013PDS4 Build 3b System Readiness4
5
Build 3a Operational Deployment April 2-3, 2013PDS4 Build 3b System Readiness5
6
Build 3a Node Test Deployment April 2-3, 2013PDS4 Build 3b System Readiness6
7
Build 3a RFA Status 11 Accepted -Planned for Build 4a delivery 11 Implemented -Included in Build 3b delivery 3 Requires Follow-up -Additional information required, if accepted planned for Build 4a delivery 3 Closed -Questions about design approaches or software behavior, responded to in RFA document April 2-3, 2013PDS4 Build 3b System Readiness7
8
Build 3b Summary Search added support for discovering and viewing Bundle and Collection information. Search was modified to address inconsistent results when specifying more than one term or parameter in the search criteria. Registry was modified to address performance issues. Validate, Harvest, Catalog and Search modified to keep pace with data model changes. Updates to the Data Access and Transform tools are about two weeks from being delivered. April 2-3, 2013PDS4 Build 3b System Readiness8
9
Build 3b Planned Deployment April 2-3, 2013PDS4 Build 3b System Readiness9
10
Search Service Status Added support for discovering and viewing Bundle and Collection information. -This also includes a first cut at PDS4 Context products. Added support for filtering search results based on space agency and model version. -Will include ESA/PSA data sets officially with this release. Still working out the kinks involved with supporting PDS3 and PDS4 data side-by-side. Here is what it looks like … April 2-3, 2013PDS4 Build 3b System Readiness10
11
April 2-3, 2013PDS4 Build 3b System Readiness11
12
April 2-3, 2013PDS4 Build 3b System Readiness12
13
April 2-3, 2013PDS4 Build 3b System Readiness13
14
April 2-3, 2013PDS4 Build 3b System Readiness14
15
April 2-3, 2013PDS4 Build 3b System Readiness15
16
April 2-3, 2013PDS4 Build 3b System Readiness16
17
Report Service Status Sawmill software installed at the EN. -Upgraded to the latest version from the vendor. Working with a few Nodes on interfaces for pulling web logs. Ready to start moving forward with population of the service. Planned operational phases: -Initiate population of the service and initial report configuration (April/May 2013). -Generate PDS-wide web log reports. (June 2013) -Generate registry-based reports. (October 2013) April 2-3, 2013PDS4 Build 3b System Readiness17
18
Build 4a and Beyond Continue to support data model changes. Add support for content validation. Continue to tune the search index. Add support for product-level search. Add support for additional transformations. Add support for visualization. Better integrate search results with available tools and services. April 2-3, 2013PDS4 Build 3b System Readiness18
19
Next Steps Work with the Nodes on Report Service population. -I promise. Work with the Nodes to deploy Build 3b software locally. -Start registering some stuff. Continue Build 4a development. -Focus on product-level support including content validation, search, transformation and visualization. April 2-3, 2013PDS4 Build 3b System Readiness19
20
Questions/Comments