Presentation is loading. Please wait.

Presentation is loading. Please wait.

Common Deficiencies observed in the Project Proposals received at NRRDA.

Similar presentations


Presentation on theme: "Common Deficiencies observed in the Project Proposals received at NRRDA."— Presentation transcript:

1 Common Deficiencies observed in the Project Proposals received at NRRDA

2 Deficiencies in Project Selection Errors in the preparation of Core Network. Errors in the preparation of Core Network. Disproportionate allocation to the Districts. Disproportionate allocation to the Districts. Deficiency in the Preparation of CNCPL/CUPL. Deficiency in the Preparation of CNCPL/CUPL. Inadequacy in the consultative process. Inadequacy in the consultative process. Deviations from CNCPL/ CUPL in the roads selected. Deviations from CNCPL/ CUPL in the roads selected.

3 Deficiencies in the Design. Inadequate investigations. Inadequate investigations. Failure to check correlations in the soil properties. Failure to check correlations in the soil properties. Inaccurate estimation of Design Parameters. Inaccurate estimation of Design Parameters. Non adherence to the provisions of RRM for Pavement Component Design. Non adherence to the provisions of RRM for Pavement Component Design. In adequate Geometric Design. In adequate Geometric Design. Failure to identify cost aberrations in the components. Failure to identify cost aberrations in the components. Inappropriate location and design of CD Works. Inappropriate location and design of CD Works. Provisions beyond permissible as per guidelines. Provisions beyond permissible as per guidelines. Deficiency in checking the Schedule of Rates, Maintenance Cost. Deficiency in checking the Schedule of Rates, Maintenance Cost. Failure to investigate alternate designs for optimality. Failure to investigate alternate designs for optimality.

4 Deficiencies in Reporting Incompatibility of data on connectivity status. Incompatibility of data on connectivity status. Incomplete data entry on OMMAS. Incomplete data entry on OMMAS. Failure to clear the proposals on - line at STA Level. Failure to clear the proposals on - line at STA Level. Incomplete data in Format “C”. Incomplete data in Format “C”. Failure to give specific remarks on individual project proposal and submission of consolidated reports by STAs. Failure to give specific remarks on individual project proposal and submission of consolidated reports by STAs.


Download ppt "Common Deficiencies observed in the Project Proposals received at NRRDA."

Similar presentations


Ads by Google