Download presentation
Presentation is loading. Please wait.
Published byMervin Little Modified over 9 years ago
1
THE OKONITE COMPANY Okoguard Insulated Power Cable 1968--PRESENT 1
2
2
3
3 OKOGUARD ALL EPR SYSTEM 40+ YRS SERVICE ENGINEERED SUCCESS
4
PRODUCT ATTRIBUTES 4 IN HOUSE DEVELOPMENT ALL EPR INSULATION SYSTEM COMPOUND FORMULA COMPOUND MIXING FACILITY FACTORY PROCESSING EQUIPMENT
5
THE OKOGUARD STORY DESIGN OBJECTIVES FORMULA MIXING FACILITY MANUFACTURING PROCESSES TESTINGAPPLICATIONS SYSTEM CONCEPT 5
6
OKOGUARD EPR SYSTEM 6 Okoguard EPR EPR S/C Strand Screen EPR S/C Insul Screen
7
THE OKOGUARD STORY DESIGN OBJECTIVE SYSTEM CONCEPT 7
8
Design Objectives 8 Electrical Stability In House Compounding Process Capability 5kv thru 69kV All Applications
9
EPR IS STABLE XLP IS UNSTABLE
10
XLP IS SOFT
11
THE OKOGUARD STORY FORMULA SYSTEM CONCEPT 11
12
12 Polymerdielectric Clayfiller Plasticizersviscosity Oxidesheat resis Antioxidantaging Peroxidecuring FORMULATION
13
EXXON VISTALON POLYMER
14
THE OKOGUARD STORY MIXING FACILITY SYSTEM CONCEPT 14
15
COMPOUND MIXING FACILITY 15 Orangeburg South Carolina 1993 93,000 Square Feet 50 Million Pounds/Yr
16
Site: 102 Acres Manufacturing Space: 83,000 sq. ft. ORANGEBURG, S.C. COMPOUND FACILITY.
20
THE OKOGUARD STORY MANUFACTURING PROCESSES SYSTEM CONCEPT 20
21
Manufacturing Processes 21 Triple Tandem Extrusion 3Plant Capability Orangeburg South Carolina Richmond Kentucky Santa Maria California
24
OKOGUARD EPR SYSTEM 24
25
INDUSTRY HISTORY 25 Thermoplastic tree retardant insulation Vertical Extruders Continuous Pellet examination Elimination of routine production tests; DC withstand test Filled Strand True triple extrusion Water blocked concentric neutrals New tree retardant compounds NO POSITIVE IMPACTS
26
Shielding
27
THE OKOGUARD STORY TESTING SYSTEM CONCEPT 27
28
TESTING 28 CANDIDATE INSULATION QUALIFICATION ROUTINE PRODUCTION 3 rd PARTY CERTIFICATION FULL SIZE CABLE TESTING
32
MANUFACTURING PROCESSES CV CONFIGURATION CV CONFIGURATION TRIPLE TANDEM EXTRUSION TRIPLE TANDEM EXTRUSION 32
33
TESTING QUALIFICATION QUALIFICATION MATERIALS LAB HV LAB 33
34
HV Lab QUALIFICATION HV Lab QUALIFICATION per Industry stds. per Industry stds. ( AEIC CS 6 – 96 now ICEA S 94-649 )
35
QUALIFICATION - done by others
37
TESTING ROUTINE PRODUCTION ROUTINE PRODUCTION AC WITHSTAND AC WITHSTAND CORONA CORONA INSULATION RESISTANCE INSULATION RESISTANCE DC RESISTANCE DC RESISTANCE PHYSICAL CHARACTERISTICS PHYSICAL CHARACTERISTICS 37
38
CORONA TESTING 38 Stress as a Percent of Rated Voltage to Ground 150% 200% 250% 300% 400% 19735 30 55 80 80 1975 5 20 35 50 - 19825 20 35 50 - 1983Okonite established internal “flat line” requirement 19875 5 5 5 10 1996-Present 5 5 5 5 5
39
THE OKOGUARD STORY APPLICATIONS SYSTEM CONCEPT 39
40
APPLICATIONS UTILITY UTILITY INDUSTRIAL INDUSTRIAL NUCLEAR NUCLEAR MEDICAL X-RAY MEDICAL X-RAY SUBMARINE SUBMARINE MASS TRANSITS MASS TRANSITS RAILROADS RAILROADS 40
42
BASIC COMPONENTS CONDUCTOR STRAND SCREEN INSULATION INSULATION SCREEN METALLIC SHIELD JACKET
46
OKOGUARD SYSTEM 46
47
OKOGUARD THE STANDARD THE STANDARD ENGINEERED SUCCESS ENGINEERED SUCCESS 40+ YR IN-SERVICE RECORD 40+ YR IN-SERVICE RECORD 47
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.