Uniting Water and People University of Minnesota and Minnesota Professionals Technical Advisory Committee Presentation November 1 st 2010
2
Simajhuleu
3
Previous Involvement
4
What We Have Learned COCCODE –Maintain current system –Collect annual fee –Skilled Masons –Part time plumber –Elected every two years –Capable and Motivated
5
Existing System Water Area A & B (details not included) 3 Supply Springs ≈2.7 L/s Water Area C Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
6
3 Supply Springs ≈2.7 L/s Existing System Water Area A & B (details not included) Water Area C Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
7
3 Supply Springs ≈2.7 L/s Water Area C Existing System Water Area A & B (details not included) Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
8
3 Supply Springs ≈2.7 L/s Water Area C Existing System Water Area A & B (details not included) Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
9
3 Supply Springs ≈2.7 L/s Water Area C Existing System Water Area A & B (details not included) Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
10
3 Supply Springs ≈2.7 L/s Water Area C Existing System Water Area A & B (details not included) Note: All sectors are fundamentally the same, but only Sector 5 is shown in this diagram
12
Design Assumptions Requirements All Static Pressure below 80 psi All Dynamic Pressures greater than 0 psi at peak flow Objectives Listed in 3.1
13
Proposed System with Existing System Interactions Water Area A & C (details not included) connection 3 1 2 4
14
Proposed System with Existing System Interactions Water Area A & C (details not included) connection 3 1 2 4
15
Proposed System with Existing System Interactions Water Area A & C (details not included) connection 3 1 2 4
16
Proposed System with Existing System Interactions Water Area A & C (details not included) connection 3 1 2 4
17
Proposed System with Existing System Interactions Water Area A & C (details not included) connection 3 1 2 4
19
Community Involvement At least 2 skilled masons and plumber on site 10% of material costs Digging of the entire trench for pipeline
20
Community Outreach
21
Operation and Maintenance
22
Sustainability