To turn a historical Ware house at the Naval Station Ship Yard into an Exercise and Recreation Center.

Similar presentations


Presentation on theme: "To turn a historical Ware house at the Naval Station Ship Yard into an Exercise and Recreation Center."— Presentation transcript:

1

2 To turn a historical Ware house at the Naval Station Ship Yard into an Exercise and Recreation Center

3 Design and Project Manage -  Front Reception Area- costumed designed to Navy specifications  Racquet ball court – standard product custom installed  Locker Room Area  Lounge Area

4 For the following items-  Furniture, fixtures, flooring and other interior products  Warehousing the product and staging the project  Labor – installation of project  Custom build reception area and Racket ball courts

5

6 8 months to complete our portion of the project Uhh.. That leaves me little room for errors But we can do it Where’s the purchase order ? Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8

7 No Problem- I’m ready for anything

8  2 month evaluation -  Location is ready to receive and store building material  Workers are ready to Install Racquet ball courts It ‘s been raining for two weeks straight and the material is moist and is not installing properly. We have to slow things down in order to give it time to dry.  But we are right on schedule –the pressure in on Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8

9

10  4 month evaluation -Ready to Install  Flooring  Bathroom fixtures  Custom lights The custom light fixtures break in shipping  I Have to reorder and wait for them to arrive  It’s ok..we are still on schedule Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8

11

12  Five month evaluation  Material for custom reception area arrives, ready for installation This is the main focus of the building and the first thing you see when entering the building. It includes – reception desk, display units, storage for racquet ball equipment, and towels  I find the lead installer /designer using illegal drugs in the bathroom Month 1Month 2Month 3Month 4Month 5Month 6Month 7Month 8

13

14  I can ignore the incident and pretend that everything is ok  I could reprimand him, tell him not to do it again and tell him to get back to work.  I could terminate our agreement and replace him with a new sub contractor and hope for the best  None of the above.

15 wait a second while I think

16 Respect yourself and others – be fair it’s not always easy – but it’s usually fair Responsibility to your organization, project or the other people involved Results - overall better working environment Better customer service long-term ( not short term ) success on a corporate level and a personnel level it's not an organization that behaves unethically; it is an individuals for one reason or another. Individuals make ethical choices, not organizations…(media partners)

17 Confidential Information Gift Giving Financial Accountability * SOX Copyright Infringement


Download ppt "To turn a historical Ware house at the Naval Station Ship Yard into an Exercise and Recreation Center."

Similar presentations


Ads by Google