Presentation is loading. Please wait.

Presentation is loading. Please wait.

Development of electric power industry in Kazakhstan: Sustainable development and energy efficiency Astana 2012 VII Eurasian Energy Forum 2-3.10.2012 Astana.

Similar presentations


Presentation on theme: "Development of electric power industry in Kazakhstan: Sustainable development and energy efficiency Astana 2012 VII Eurasian Energy Forum 2-3.10.2012 Astana."— Presentation transcript:

1 Development of electric power industry in Kazakhstan: Sustainable development and energy efficiency Astana 2012 VII Eurasian Energy Forum 2-3.10.2012 Astana

2 Electricity balance forecast

3 Generation projects up to 2030 2012, GW 2030, GW ∆ TPP17,524,77,2 HPP2,22,90,7 RES0,13,53,4 NPP - 0,9 0,9 growth162% Total volume of investments Total volume of investments $ 63 bln

4 Structure of generating capacities 82,4% 9,1% 70,9% 6,0 0,5% 2012 11,1% 6,3% 2030 10,9% 2,8%

5 “Samruk-Energy” JSC 2012, forecast Samruk-Energy RK % Installed capacity, GW 7,9 19,8 40,0 Power generation, bln. kWh 28,2 90,3 31,2 Coal mining, mln.tons 42,0 113,0 37

6 Schematic map of Kazakhstan UES at the level of 2030 year

7 Importance of energy saving Law “On Energy efficiency and Energy saving” Energy audit Reducing GDP energy intensity Improving the competitiveness of goods and services Large-scale introduction of new technologies Release of generating capacities Conservation of natural resources

8 Expected results Establishment of Kazakhstan Smart grid The maximum use of transit and export potential The large-scale involvement of Renewable energy sources into fuel and energy balance Energy security

9 Thank you for your attention.


Download ppt "Development of electric power industry in Kazakhstan: Sustainable development and energy efficiency Astana 2012 VII Eurasian Energy Forum 2-3.10.2012 Astana."

Similar presentations


Ads by Google