Download presentation
Presentation is loading. Please wait.
Published byHerbert Stone Modified over 9 years ago
1
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Mod 426 - Entry Overruns Transmission Workgroup July 5 th 2012
2
2 Background Modification 426 – Amendment to the NTS System Entry Overrun Charge raised to: add 8* current MSEC firm reserve price (at that ASEP) as a bottom stop to the existing overrun calculation to remove the potential for zero or no overrun charges to be generated NGG gave a presentation at 7 th June Transmission Work Group and the following actions were received Action 0426/001: Provide details of the instances of the overruns, demonstrating the volume involved and the overrun charge that would have applied with the proposed solution. Action 0426/002: Provide an explanation of the costs and timescale of implementation.
3
3 Entry Overrun Data YearNo. of instances of overruns incurring a zero / non overrun charge Maximum Overrun Quantity GWh Total Overrun Charges incurred Estimated *Total of Overrun Charges applied under modification 426 2008342.20£4,414 200995.60£8,757 20102710.70£10,953 2011617.10£13,324 * Based on current MSEC Reserve Prices
4
4 ROM raised Estimated costs £86k to £102k System change to include Code change to overrun prices calculation batch job in Gemini Including indicative overrun price screen Testing of NTS Entry Capacity invoice processes and impacted charges, including regression testing Initial data setup for any new parameters Estimated duration Delivery, detailed design and development, testing and post implementation support will take 15 weeks to 21 weeks Timescale Implementation to consider existing programme of Gemini changes Planning to be determined
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.