Presentation is loading. Please wait.

Presentation is loading. Please wait.

DEVELOPMENT OF THE ACQUISITION SYSTEM FOR HUGE DATA FLOWS IN DIAGNOSTIC PLANT SYSTEMS OF THE ITER I.Semenov, A.Khilchenko*, S.Portone, N.Marusov, E.Mironova,

Similar presentations


Presentation on theme: "DEVELOPMENT OF THE ACQUISITION SYSTEM FOR HUGE DATA FLOWS IN DIAGNOSTIC PLANT SYSTEMS OF THE ITER I.Semenov, A.Khilchenko*, S.Portone, N.Marusov, E.Mironova,"— Presentation transcript:

1 DEVELOPMENT OF THE ACQUISITION SYSTEM FOR HUGE DATA FLOWS IN DIAGNOSTIC PLANT SYSTEMS OF THE ITER I.Semenov, A.Khilchenko*, S.Portone, N.Marusov, E.Mironova, E.Rogova, “Project Center ITER” Russia, Moscow, sq. Academic Kurchatov sq., 1 *BINP SO RAS, Novosibirsk, prosp. Lavrentieva 11 E-mail: i.semenov@iterrf.ru, A.D.Khilchenko@inp.nsk.su, s.portone@iterrf.ru, n.marusov@iterrf.ru, e.mironova@iterrf.ru, e.rogova@iterrf.ru,i.semenov@iterrf.ruA.D.Khilchenko@inp.nsk.sus.portone@iterrf.ru n.marusov@iterrf.rue.mironova@iterrf.rue.rogova@iterrf.ru 1GRID2012, Dubna, July 16-20, 2012

2 ITER Major plasma radius: R - 6.2 м Minor radius: a - 2.0 м Plasma current: 15 MA Объем плазмы: 815 м 3 Toroidal field B T : 5.3 T Burning time: > 400 с Construction: 2006(7)-2016(17) (Now 2020). Operation: 2016-2036 Total project coast: 10 B$ One day operation coast: ~2.5 M$. Fusion Parameters : Working gas D+T T e =T i = 15 keV n e =10 20 m -3 neutron flux> 10 16 n/m 2 s DT Power– 500 МW

3 ITER data distribution structure For 5 PB/Year ~2 10 6 Channels Data flow - 10-100 GB/sec Plasma duration – 30 min Total Data during the year ~ 5 PB/Year 3GRID2012, Dubna, July 16-20, 2012

4 Estimate of ADC channels and raw data MS/s Bit 1 10 100 1000 0.1 10 12 14 16 18 ~5 ~600 ~300 ~2000 ~ 3000 Bits : Datasheet ENOB : Bits -1.5 FS # channels required 60 GB/s *2 (no timestamp) 60 GB/s *10 (with timestamp) 300 GB/s * 2 * DC (duty cycle = 0.1 ?) <40 GB/s * X < 1 GB/s Sum = (100 -1000) GB/s * Demand DC 4GRID2012, Dubna, July 16-20, 2012

5 ITER control room (IBM proposal) 5GRID2012, Dubna, July 16-20, 2012

6 6 Физическая архитектура ИТЭР I&C

7 GRID2012, Dubna, July 16-20, 20127 Limitations in standatd fast measurement channel

8 GRID2012, Dubna, July 16-20, 20128 Online data processing

9 ADC12500PXIe functional diagram 9GRID2012, Dubna, July 16-20, 2012

10 ADC12500PXIe Digitizer Prototype module 10GRID2012, Dubna, July 16-20, 2012

11 11 Measurement schema in ATCA standard

12 В частотной области filter Signal Gauss weighting function Filter responce (Timing domain) Convertion error HV power source High voltage divider NaI scincillator Photomultiplier Sрectrometer (ADC12500) Cs & Co Neutron diagnostics (stilben) Gamma spectroscopy [BGO, NaI(Tl)] ADC12500: applications 12GRID2012, Dubna, July 16-20, 2012

13 Thank you 13

14 ITER at CADARASHE

15 Cadarashe


Download ppt "DEVELOPMENT OF THE ACQUISITION SYSTEM FOR HUGE DATA FLOWS IN DIAGNOSTIC PLANT SYSTEMS OF THE ITER I.Semenov, A.Khilchenko*, S.Portone, N.Marusov, E.Mironova,"

Similar presentations


Ads by Google