Download presentation
Presentation is loading. Please wait.
Published byCornelius Walker Modified over 9 years ago
1
GEM R&D updates from Chinese groups Yuxiang Zhao University of Science and Technology of China May 24,2013 1
2
Five Chinese Groups China Institute of Atomic Energy (CIAE) Lanzhou University Tsinghua University University of Science and Technology of China (USTC) Institute of Modern physics 2
3
3 Updates from Yi Zhou
4
30cmx30cm GEM chamber assembling(NS2) Shielding board(top) GEM foil 4
5
Setup for the Lab test Read out board, pad readout for Lab test Top of the chamber, holes for radioactive source Test platform 5
6
To do list Noise issue(High voltage divider???) Lab test – Uniformity test – Gain – Charging effect, etc Italian electronics 6
7
7 Updates from Xiaomei Li
8
Photolithography Lab Construction At CIAE Key step for GEM foil production: Lamination and exposure of dry film photoresist Lab construction at CIAE after CERN training session Hot Roll Lamination(HRL) machine Exposure system Room equipped with yellow light source 1 2 3 8
9
Exposure of Dry Film Photoresist Doing test for Lamination and exposure of dry film photoresist Collaborated with PCB factory Accuracy needs to be improved 9
10
Recent Funds CIAE group have got three funds recently: Two from CIAE for Lab Construction and Detector Development Fund from State Key Laboratory of Particle Detection and Electronics for the R&D of Large Area GEM foil 10
11
11 Updates from Zhigang Xiao
12
Last Update of GEM at Tsinghua University Hardware Preparation: 1 45x45 cm2 GEM foils arrived in Feb and shipped to DetLab at IMP. 2Assembling techniques: To use glue method 3To use strip readout for the large area prototype. 4 First Large area ( 45*45 cm2 ) prototype is expected in the next two months, (not sure whether can be ready by Huangshan workshop) 5 Test ASIC based FEE and VME DAQs. 1) 64 channels of APV FEE (developed in Tsinghua University) delivered; 2) Noise performance is not promising, we spent a lot of time and energy to reduce the noise level to a usable status (All test are OK without connecting to detector). Grounding to be improved. 3) VME-DAQ with multi peak-ADC modules development done and tested recently.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.