Download presentation
Presentation is loading. Please wait.
Published byJonas Edwin Murphy Modified over 9 years ago
1
River Basin Planning and Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 Water Resources System Modeling
2
Objectives D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 2 To discuss about the activities in river basin planning and management To learn about integrated water resources management (IWRM) To introduce various models for IWRM
3
Introduction D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 3 River basin: Geographical area demarcated by the topographic limits of the system of waters There are strong interactions between land and water resources, or between surface and ground water in the basin River basins are important elements in water resource development and planning It possesses fresh water and also shapes up the landscapes The upstream basin characteristic influences the availability of water for various purposes like irrigation, hydropower generation, recreation, navigation River basins are also the most productive ecosystems
4
River Basin Management (RBM) D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 4 It deals with the management of water resources in the basin Purpose of RBM: To ensure the use of water and other resources in the basin in a sustainable manner Most of the basins have multi-objectives and limited resources It is necessary to assign priorities to different needs Need for RBM arises from the non-coordinated usage or even overexploitation of resources RBM can be divided into six activities: Planning Construction Operation Monitoring Analysis and Decision making
5
River Basin Management… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 5 Activities in RBM Basin and its users are directly affected by operation and management activities only Operation activity has a direct influence on the basin This includes regulation of facilities and application of economic, legal and policy instruments This is conducted through analysis and decision support systems (DSS) Management Monitoring Analysis Decisions Planning Construction Operation River basin and users
6
River Basin Management… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 6 RBM may change the basin characteristics by the construction of storage or diversion structures; by implementing allocation rules, water rights and permits; by imposing taxes and subsidies to control water usage RBM may also contain a number of related activities like public participation, international participation or cooperation between related organizations. Most important structural regulation in RBM is the reservoir operation. A very sensitive operational issue in RBM is charging the users for water usage. This is an effective means to minimize wastage and also it will finance development activities in the basin. However, the charges should be low enough for the poor to afford.
7
River Basin Planning D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 7 Planning is an important and inevitable part in the utilization of water resources and in the operation of projects Helps to assess the present situation and achieve the desired situation by filling the gaps Offers a framework by setting priorities and also results in more public support Planning brings together managers of different river basins together Planning has four functions: (a) To assess the current situation, formulate and set goals and targets, orient the operation and management. (b) To provide framework for public participation and feedback (c) To increase legitimacy and mobilize public acceptance (d) To facilitate interaction among the concerned organizations and shareholders
8
River Basin Planning… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 8 Important activities of planning of river basins are: (a) Identification of need, scope and geographical coverage area. (b) Analysis of institutional framework, identification of decisions, and the formulation of bodies. (c) Identification of stakeholders, their preferences and expectations (d) Preparation of blueprint of scopes, identify different phases and groups involved, prepare a flowchart of activities (e) Formulation of plans and its approval (f) Implementation of plan
9
River Basin Planning… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 9 Types of plan for a particular river basin depend on different factors such as policy issues, location, available funds etc. These factors differ from country to country and basin to basin. RBM should also consider the interrelations within water systems (i.e., surface, and subsurface; quantity and quality), the interrelations between climate, land and water and also interrelations between complete river basins and their socio-economic environment. The planning depends on the number of functions to be performed. If the main goal is drinking water supply for an urban city, then there is no need to consider strategic planning which may require an overall description of the basin. If too many plans are to be executed simultaneously, then the availability of resources and also coordination can become a problem.
10
Integrated Water Resources Management D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 10 River basin can be divided into three components: Source components (rivers, reservoirs, aquifers and canals), Demand components (off-stream such as irrigation fields, industrial plants and cities and in- stream such as hydropower, recreation and environment) and Intermediate components (treatment plants, reuse and recycling facilities). According to the Technical Advisory Committee (TAC) Global partnership 2000 IWRM is a process which promotes the coordinated development and management of water, land and related resources, in order to maximize the resultant economic and social welfare in an equitable manner without compromising the sustainability of vital ecosystems. IWRM integrates three systems: natural, socio-economic and institutional. IWRM manages the conflict that may occur between the physical and social linkages of a water system.
11
Integrated Water Resources Management… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 11 Along with managing various projects in a basin, IWRM also manages utilization of water for consumptive uses, non-consumptive uses and in-stream uses. Water use Consumptive use In-stream use Non -consumptive use Water quality control Water resources Water resources project Water use Water resources project Ultimate disposal Steps in water resources management
12
Models for IWRM D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 12 First Generation Models: Concentrated in hydraulic and hydrologic aspects such as flood routing, reservoir operation etc. Models for sediment transportation and water quality simulation were developed side by side. Streamflow Synthesis and Reservoir Regulation (SSARR) from USACE SIMLYD –II from Texas water development board HEC-5 model is also widely used to simulate operation of reservoir systems.
13
Models for IWRM… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 13 Second generation models: Able to consider both hydrologic and water quality aspects These are able to perform interactive analysis and display of results Interactive River – Aquifer Simulation (IRAS) by Loucks et al. (1994) extensively uses graphics in system simulation European Hydrological System (SHE) is a distributed and physically modeled system and describes the major land flow processes of the hydrologic cycle MIKE SHE is a advanced version of SHE with add-ons for water quality, soil erosion, irrigation etc Water quality simulation models are a standard feature of river basin models Widely applied one is the Enhanced Stream Water Quality Model (QUAL2E) which simulates temperature, dissolved oxygen, biochemical oxygen demands etc. Another one is the Water Quality for River Reservoir Systems (WQRSS) by Hydrologic Engineering Center.
14
Models for IWRM… D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 14 Third generation models: Interactive models with graphical user interfaces, GIS inputs and screen display of results Tennessee river valley authority Environment and River resource Aid (TERRA): Reservoir and power generation management tool linked to a local area network for real time functioning River Basin Simulation Model (RIBASIM): Simulates river basins for various hydrological conditions Links hydrological inputs at various locations with specific water uses in the basin Evaluates alternatives of infrastructure, operational and demand management through a decision support system (explained in the previous module). MIKE BASIN: Represents rivers and tributaries as network with branches and nodes. Has a graphical interface which is linked to ArcView GIS Gives information on individual reservoir outputs and irrigation scheme with frequency and magnitude of water shortages.
15
MIKE SHE (http://www.crwr.utexas.edu/gis/gishyd98/dhi/mikeshe/Mshemain.htm)http://www.crwr.utexas.edu/gis/gishyd98/dhi/mikeshe/Mshemain.htm D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 15 An advanced integrated hydrological modeling system Simulates water flow in the entire land based phase of the hydrological cycle from rainfall to river flow, via various flow processes such as, overland flow, infiltration into soils, evapotranspiration from vegetation, and groundwater flow Hydrologic processes simulated by MIKE SHE
16
MIKE SHE D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 16 MIKE SHE is linked with ArcView GIS for pre- and post-processing of data. Main characteristics: (i) Integrated: Fully dynamic exchange of water between all major hydrological components is included, e.g. surface water, soil water and groundwater (ii) Physically based: Solves basic equations governing the major flow processes within the study area (iii) Fully distributed: The spatial and temporal variation of meteorological, hydrological, geological and hydrogeological data across the model area is described in gridded form for the input as well as the output from the model (iv) Modular: It has a modular structure, which allows user to focus only on the processes, which are important for the study.
17
MIKE SHE D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 17 MIKE SHE has been used for the analysis, planning and management of a wide range of water resources problems such as: River basin management and planning Water supply design, management and optimization Irrigation and drainage Soil and water management Conjunctive use of groundwater and surface water Groundwater management Contamination from waste disposal Floodplain studies Impact of land use and climate change etc.
18
MIKE BASIN (http://www.crwr.utexas.edu/gis/gishyd98/dhi/mikebas/Mbasmain.htm)http://www.crwr.utexas.edu/gis/gishyd98/dhi/mikebas/Mbasmain.htm D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 18 Modeling tool for integrated river basin planning and management Developed by DHI in Denmark (http://www.dhisoftware.com/mikebasin)http://www.dhisoftware.com/mikebasin Addresses water allocation, conjunctive use, reservoir operation, and water quality issues. Couples ArcGIS with hydrologic modeling to provide basin-scale solutions Provides a mathematical representation of the river basin encompassing the main rivers and their tributaries, the hydrology of the basin in space and time, existing as well as potential major schemes and their various demands of water. River systems are represented by a network consisting of branches and nodes. Branches represent individual stream sections Nodes represent confluences, locations where certain water activities may occur, or important locations where model results are required.
19
MIKE BASIN D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 19 Gives emphasis is on both simulation and visualization in both space and time Typical areas of application include Water availability analysis Conjunctive surface and groundwater use Infrastructure planning Assessing irrigation potential and reservoir performance Estimating water supply capacity Determining waste water treatment requirements.
20
MIKE BASIN D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 20 Graphical User Interfaces (GUI) for different applications (Source: http://www.crwr.utexas.edu/gis/gishyd98/dhi/mikebas/Mbasmain.htm).http://www.crwr.utexas.edu/gis/gishyd98/dhi/mikebas/Mbasmain.htm Representation of river network in a basin
21
MIKE BASIN D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 21 GUI’s for different applications (Source: http://www.crwr.utexas.edu/gis/gishyd98/dhi/mikebas/Mbasmain.htm).http://www.crwr.utexas.edu/gis/gishyd98/dhi/mikebas/Mbasmain.htm Illustration of results – Flow at a node
22
MIKE BASIN D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 22 GUI’s for different applications (Source: http://www.crwr.utexas.edu/gis/gishyd98/dhi/mikebas/Mbasmain.htm).http://www.crwr.utexas.edu/gis/gishyd98/dhi/mikebas/Mbasmain.htm (a) (c) (b) Delineation of catchment and river networks from digital elevation models (DEMs)
23
D Nagesh Kumar, IISc Water Resources Planning and Management: M8L1 Thank You
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.