1 Single cell coordination

2 Single Cell Cavity Activity 6-month plan 1.ANL EP cavities (TE1AES005, TE1ACC001) 2.R&D cavities Tumble, 2 cavities Laser re-melting, 2 cavities CMP process, 1-2 cavities ECS investigation, 2 cavities manufacturing optimization, 2 cavities ALD cavities Traveling wave cavity, 2 cavities E-beam remelting (Cornell) 3.Vendor qualification PAVAC single cells, 6 cavities RRCAT single cells, 1 cavity 4.Infrastructure support Furnace verification, 1 cavity. Diode T-map and second sound development 1 cavity ANL HPR water verification 1 cavity ABLE EP 2 cavities 5.Basic R&D cavity cutting for samples 2 cavities 3.9GHz in separate list

3 NumberCurrent locationMain purposeCurrent statusNotes TE1AES004FNAL/A0Equator pit quenching, T-mapRF Test done, same as before TE1AES005FNAL ICBCMP, EP, ABLETo be HF rinsed TE1ACC001FNAL/IB4FERF test to done at A0, same performance TE1ACC002CABOTCMPRF test done, to be polished at CABOT TE1ACC003FNAL/ICBlaser remeltingpit molding done, RF done TE1ACC004FNAL/IB4Tumbling, EPTo be baked at JLAB TE1ACC005FNAL_ICBEddy current scanningTo be progressive EP TE1ACC006FNAL_ICBEddy current scanningTo be progressive EP NR-1FNAL/ICBFor baking furnace qualification ?At ANL for cryo-fitting. to be inspected and molding NR-4ANLABLE EPTo be HPR/Baking NR-5FNAL/ICBE-beam remelting on Pitinspected, to be processed NR-6FNAL/IB3Laser re-meltingequator weld pit TE1PAV001PAVAC TE1PAV002PAVAC TE1PAV003PAVAC TE1PAV004PAVAC TE1PAV005PAVAC TE1PAV006PAVAC TE1PAV007 TE1RRC001to be made at RRCAT TW1AES001AESTraveling wave prototype Cavity inspection, Tooling design for BCP TW1AES002AESTraveling wave prototype Cavity Inspection