17/03/01 PDR ATLAS Alignment, Olivier Cloué1 ATLAS ALIGNMENT (BARREL) : Installation at CERN (1) zEstimated dates : (Web planning) y11/2004 -> Start of.

Similar presentations


Presentation on theme: "17/03/01 PDR ATLAS Alignment, Olivier Cloué1 ATLAS ALIGNMENT (BARREL) : Installation at CERN (1) zEstimated dates : (Web planning) y11/2004 -> Start of."— Presentation transcript:

1 17/03/01 PDR ATLAS Alignment, Olivier Cloué1 ATLAS ALIGNMENT (BARREL) : Installation at CERN (1) zEstimated dates : (Web planning) y11/2004 -> Start of chamber installation (Atlas installation milestone of 14/07/00) y05/2005 -> Date of the last built chamber (planning of 15/01/01) zIntroduction yEach calibrated mechanical support will be identified and traced by a bar code. A mounting procedure on the platform will have to be specified. yThe mounting can begin as soon as the first chamber is ready to be installed on the detector (end of 2004) yWe expect to have a buffer room to prepare and test the chambers before their integration in the detector (mainly for the PRAXIAL system) yReminder: The cabling of the various optoelectronical components will be already integrated (realised by the institutes during the construction of the MDTs)

2 17/03/01 PDR ATLAS Alignment, Olivier Cloué2 ATLAS ALIGNMENT (BARREL) : Installation at CERN (2) zInstallation of sensor supports yOn MDTs xBefore the installation of the MDTs in the cavern (surface work) PRAXIAL system supports xAfter the installation of the MDTs in the cavern PROJECTIVE system : RASNIK cubes and extension plates REFERENCE system supports BIM-BIR connection supports yOn the toroid in the cavern REFERENCE system : mechanical plates and camera supports before the chamber installation

3 17/03/01 PDR ATLAS Alignment, Olivier Cloué3 ATLAS ALIGNMENT (BARREL) : Installation at CERN (3) zREADOUT installation yRASMUX yMASTERMUX yUSA 15 Mux yPC yMaster PC yCabling 4 x PC 48->8 Crate Power Control PC MasterMuX RasMuX RasCAM RasLED SacLED 16 -> 1 CAM 8 -> 1 LED 1 -> 16 16 -> 1 CAM 8 -> 1 LED 1 -> 16 Magnet supportChambers USA15-MuX USA15 Rack PC Room

4 17/03/01 PDR ATLAS Alignment, Olivier Cloué4 ATLAS ALIGNMENT (BARREL) : Installation at CERN (4) zInstallation Procedure of sensor supports Mechanical connection : fixation with specific tools Plugging of RasCam, RasLed and SacLed Global test with the ATLAS alignment readout Installation and cabling of the readout component First electric test with a specific readout

5 17/03/01 PDR ATLAS Alignment, Olivier Cloué5 ATLAS ALIGNMENT (BARREL) : Planning of PRAXIAL SYSTEM

6 17/03/01 PDR ATLAS Alignment, Olivier Cloué6 ATLAS ALIGNMENT (BARREL) : Planning of PROJECTIVE SYSTEM

7 17/03/01 PDR ATLAS Alignment, Olivier Cloué7 ATLAS ALIGNMENT (BARREL) : Planning of REFERENCE SYSTEM

8 17/03/01 PDR ATLAS Alignment, Olivier Cloué8 ATLAS ALIGNMENT (BARREL) : Planning of BIM/BIR CONNECTION

9 17/03/01 PDR ATLAS Alignment, Olivier Cloué9 ATLAS ALIGNMENT (BARREL) : Planning of READOUT

10 17/03/01 PDR ATLAS Alignment, Olivier Cloué10 ATLAS ALIGNMENT (BARREL) : Planning