Download presentation
Presentation is loading. Please wait.
Published byEmery Smith Modified over 9 years ago
1
Creating Complete UID Solutionsby Creating Complete UID Solutions by Bridging the Gap… Creating Complete UID Solutionsby Creating Complete UID Solutions by Bridging the Gap… Between UID Policy and Implementation
2
The Force, Inc. Headquartered in Huntsville, AL Leaders in the development and application of Life Cycle Management Processes Reliability Centered Maintenance Parts Marking Analysis and Implementation Soldier Focused Logistics Sets, Kits, Outfits and Tools (SKOT) Customers: Army Aviation: CH-47 Chinook Naval Air Systems Command Department of Energy
3
What is the GAP? Policy Strategy Development UID Registration Analysis and Documentation Engineering Approval Parts Marking
4
U 2 ID Selection Process™ Equipment Manufacturer Facilitator Equipment Specialist Test Pilot System Engineer Depot Rep Facilitated Group Approach Ensures the right people who are sensitive to the hazards of the equipment in its operating environment are the decision makers Parts marking solutions are identified using Reliability Centered Maintenance (RCM) techniques Systematic review of all failure modes, failure effects, and consequences of each marking opportunity U 2 ID Selector ™
5
US Army’s Model UID Implementation Program December 2004 memo Subject: Implementation of Unique Identification (UID) Policy Assistant Secretary of the Army, Mr. Claude Bolton, designates the CH-47 as the Army’s Model UID implementation program
6
US Army’s Model UID Implementation Program 12 May 2005 memo Subject: Policy Update for Item Unique Identification of Tangible Personal Property… The Under Secretary of Defense, Mr. Michael W. Wynne, “applauds the CH-47 (UID Program) program.”
7
Why choose The Force? The primary architects of the CH-47 Parts Marking program are all currently associated with The Force. The Force, Inc. has a Strategic Relationship with The University of Alabama of Huntsville (UAH) for engineering support. UAH - Space Shuttle Parts Marking Analysis Lead
8
The Force, Inc. 1525 Perimeter Parkway, Suite 105 Huntsville, AL 35806 UID@TheForceInc.com Tel: 256-428-8868
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.