Download presentation
Presentation is loading. Please wait.
Published byGervase Wright Modified over 8 years ago
1
New Somersworth Idlehurst Park Elementary School Presented By: Team Design Inc. Architectural and Consulting Services
2
Aerial Site Plan – Somersworth Idlehurst Park Elementary
3
Studies and Reports to Date Wetland Site Investigation –Gove Environmental Services December 2006 Site Inspection –Appledore Engineering January 2007 Phase I Environmental Site Assessment –S.W. Cole Engineering, Inc. February 2007 Land Survey –Doucet Survey, Inc. June 2007 Lot Line Adjustment & Boundry –Doucet Survey October 2007 Registry of Deeds 1/19/08 Phase I Preliminary Archeological Reconnaissance Report – Victoria Bunker, PhD & Shelia Charles July 2007 Geotechnical Engineering Services –S.W. Cole Engineering, Inc. July 2007 Traffic Assessment –Transportation Engineering, Planning and Policy LLC. May 2008
4
Conceptual Site Plan by: Appledore Engineering
5
Building & Educational Program Narrative Staff Interviews and Comments from Administrators Building Program Technology Program Educational Program Areas –General Classrooms –Specialized Classrooms –Special Service Areas –Core Areas –Educational Support Areas –Facilities Support Areas
6
Floor Plan by: Team Design Inc.
7
Rendering of Front Entrances
8
Main Entrance
9
Kindergarten Playground Area
10
Front Aerial View
11
Back Aerial View
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.