Download presentation
Presentation is loading. Please wait.
Published byDuane Blankenship Modified over 9 years ago
1
Class of 1965 Centre for Innovation in Teaching and Learning (CITL) Update Presentation 22 October 2015 1
2
RMC needs to expand its activities that enhance education: o Teaching beyond: Technological & Pedagogical Innovations in Education. o Student success beyond: Writing Centre, Math Assist Programme. We need to look at teaching and student success in the broadest possible way. CITL 2
3
CITL concept presented to Faculty 04-2015: o Joint Faculty Board meeting with CMR of St Jean and RMC of Canada. Overwhelming support. Too many volunteers. Large multidisciplinary committees at RMC CITL Committee 3
4
18 members: o All faculties represented, o One TEA winner and two runners-up, o Reps from three colleges, o Students: 2 cadets, 2 graduate students. o Other stakeholders: Library, Division of Continuing Studies, Training Wing, Language Centre, CDA. CITL Committee 4
5
Group has met 6 times: o 9 meetings due to difficulties getting together. CITL Committee: o reviewed concept 15 June ( entire group ), o developed list of required data 24 June ( entire group ), o developed questionnaires over summer 27 July, 10 Sept, 16 Sept ( sub-committee ), o Reviewed questionnaires 29 Sept ( entire group ). CITL Committee 5
6
We need to survey the following: o ALL students, What do they want and need. o ALL instructors, What do they want and need. o Subject matter experts (SME) at other universities, What is new and what works. Conduct an inventory of teaching and learning tools/programmes at our colleges. Required information 6
7
Survey all students and instructors. Survey has 4 parts (11-14 questions). o Tombstone information, o Information on teaching, o Information on student services, o Open-ended comments. Delivered using ClassClimate® software, o Tool we use for course evaluations. Required information – Surveys 7
8
Where are we now? o Questions fully developed, o Consulted with the Faculty Association, o Translation to French will be completed 23 Oct, o Research Ethics Board review underway, o ClassClimate survey set-up 50% completed. Test surveys on instructors and students. Survey delivery slated for early November. Analysis in December-January. Required information – Surveys 8
9
Subject matter expert (SME) survey: o Telephone/visit with SME at (tentatively): Queen’s, Ottawa, Trent, Moncton, Laurentien o Questions being developed by sub-committee. o SME survey to be conducted in November. Required information – Surveys 9
10
Inventory of existing teaching/learning/services at RMC of Canada completed by Dr. Scoppio. Document being updated by CMR St. Jean and CFC. Required information – Inventory 10
11
Deliver survey to (Nov): o Students, o Instructors, o SME. Analysis of data (Dec-Jan). Present results to CITL group (Jan). CITL develops plan and sets priorities. Next steps 11
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.