Download presentation
Presentation is loading. Please wait.
Published byPatience Bryant Modified over 8 years ago
1
Mass Diagrams Balance Cuts and Fills Shrink/swell Mass Diagram Cost Analysis
2
Cuts/Fills Need to Balance Excess fill must be borrowed Excess cut must be wasted You pay for cut + waste or fill Haul Length Cost Effectiveness
3
Shrink/Swell Most Common Excavation shrinks Embankment (Fill) placed at higher density 1 cy cut yields < 1 cy fill Varies from 5% - 20% Depends on soil type Factor of 1.2 is common Rock excavation swells
4
Mass Diagram Cumulative total of cut/fill Cut –> (+) Fill -> (-) Plot Cuml Total (cy) vs. location (Sta) Mass Diagram peaks where profile changes from cut to fill
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.