© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015
2
Economic Assessment o Model overview o Assumptions o Findings o Discussion & Next Steps Agenda
3
MODELING THE ECONOMIC IMPACT OF ROUTE 11 CANTON-POTSDAM BYPASS Chris Judson, Economic Impact Analysis Task Leader
4
Study Area
5
Improve Roadway Operations and Freight Mobility Support Economic Development: Evaluate the economic development potential and benefits of the proposed alternatives to inform the decision-making process. Improve Safety and Quality of Life: Develop roadway alternatives that avoid conflicts with other transportation modes and roadway users in village centers Purpose of Study
6
TranSight Structure & Modeling Approach HDR
7
REMI Model Overview Employment 15 yr30 yr Start Year
8
Design Costs Professional, scientific, and technical services - 54 o Spread evenly over 2015-2016 and by regional value added Small impact to St. Lawrence County Survey & Stake Out Detailed Industry Sales > Architectural, engineering, and related services - 541300 o Modeled within St. LC, and spread evenly over two year period Planning 2 Lane Arterial Scenario
9
Right of Way Transfer Payments o 2016, purchase land for environmental mitigation Site clearing and preparation o Spread over two years, exogenous final demand construction in St. LC Mobilization Government Spending o Spread over three years Construction 2 Lane Arterial Scenario
10
Primary Construction Activity Includes: Roadway, Grade Separation Without Interchange, Structure Over Water, and Maintenance of Traffic o Detailed Industry Sales > Highways, Bridges Streets - 233293 Spread evenly over between 2017-2020, Construction 2 Lane Arterial Scenario
11
2 Lane Arterial Planning & Construction Results
12
2 Lane Arterial Planning & Construction Results – Percent Change From Baseline
13
Design Costs Professional, scientific, and technical services - 54 o Spread evenly over 2015-2016 and by regional value added Small direct local impact to St. Lawrence County Survey & Stake Out Detailed Industry Sales > Architectural, engineering, and related services - 541300 o Modeled within St. LC, and spread evenly over two year period Planning 4 Lane Arterial Scenario
14
Right of Way Transfer Payments o 2016, purchase land for environmental mitigation Site clearing and preparation o Spread over two years, exogenous final demand construction in St. LC Mobilization Government Spending o Spread over three years Construction 4 Lane Arterial Scenario
15
Primary Construction Activity Includes: Roadway, Grade Separation Without Interchange, Structure Over Water, and Maintenance of Traffic o Detailed Industry Sales > Highways, Bridges Streets - 233293 Spread evenly over between 2017-2020 Construction 4 Lane Arterial Scenario
16
4 Lane Arterial Planning & Construction Results
17
4 Lane Arterial Planning & Construction Results – Percent Change From Baseline
18
2020, 2034, 2049 .011% decrease in transportation and accessibility costs for 2 Lane .0116% decrease in transportation and accessibility costs for 4 lane o Just over a 5% increase in cost savings Network Benefits
19
Network Benefits Results – 2 Lane Low Scenario
20
Network Benefits Results – 2 Lane Low Scenario, Percent Change from Baseline
21
Network Benefits Results – 2 Lane High Scenario
22
Network Benefits Results – 2 Lane High Scenario, Percent Change from Baseline
23
Network Benefits Results – 4 Lane Low Scenario
24
Network Benefits Results – 4 Lane Low Scenario, Percent Change from Baseline
25
Network Benefits Results – 4 Lane High Scenario
26
Network Benefits Results – 4 Lane High Scenario, Percent Change from Baseline
27
NAICS 325 - Chemical Manufacturing o Exports from Quebec to New York Over $ 317 million in 2014 Average of over $ 345 million between 2005-2014 o Average annual compensation for industry in St. Lawrence county: $ 101,805 dollars Business Attraction – Chemical Manufacturing
28
Chemical Manufacturing – High Case $50 M in 2020, $150 M by 2034
29
Chemical Manufacturing – Low Case $5 M in 2020, $15 M by 2034