Presentation is loading. Please wait.

Presentation is loading. Please wait.

NANOG Brooklyn – June, 2008 Vince Fuller (for Dino, Dave, Darrel, et al) LISP Update

Similar presentations


Presentation on theme: "NANOG Brooklyn – June, 2008 Vince Fuller (for Dino, Dave, Darrel, et al) LISP Update"— Presentation transcript:

1 NANOG Brooklyn – June, 2008 Vince Fuller (for Dino, Dave, Darrel, et al) LISP Update http://www.vaf.net/prezos/lisp-nanog-nyc.pdf

2 LISP UpdateNANOG Brooklyn, June, 2008Slide 2 A picture is worth…

3 LISP UpdateNANOG Brooklyn, June, 2008Slide 3 LISP: What and Why? Locator Identifier Separation Protocol ‘Map-n-Encap’ scheme Aggregation of Locators for routing Topology-independent Identifiers Simple, scalable multi-homing with TE See: www.vaf.net/prezos/rrg-prague.ppt and www.vaf.net/prezos/lisp-tutorial.pptwww.vaf.net/prezos/rrg-prague.pptwww.vaf.net/prezos/lisp-tutorial.ppt

4 LISP UpdateNANOG Brooklyn, June, 2008Slide 4 Implementation Status cisco has a LISP prototype implementation –Started the week of IETF Prague (March 2007) OS platform is NX-OS (on top of Linux) Hardware platform is Titanium –1 RU dual-core off-the-shelf PC with 7 GEs Based on draft-farinacci-lisp-07.txt Software switching only Supports both IPv4 and ipv6 Includes ALT and Interworking (PTR & NAT)

5 LISP UpdateNANOG Brooklyn, June, 2008Slide 5 Implementation Status IOS 12.4T prototype is in the works OpenLISP implementation draft-iannone-openlisp-implementation-00.txt Would really like to see more

6 LISP UpdateNANOG Brooklyn, June, 2008Slide 6

7 LISP UpdateNANOG Brooklyn, June, 2008Slide 7 Wanna play with us? Looking for more external test sites –We provide: hardware, software, coordination –You provide: rack, power, console, time (1x day/wk), end-to-end test target system (optional) Goals: –Test multiple implementations –Experience with operational practices –Learn about revenue making opportunities –Improve protocol design and implementation Contact us: lispers@cisco.comlispers@cisco.com See also: lisp-interest@lists.civil-tongue.netlisp-interest@lists.civil-tongue.net and check out: www.lisp4.netwww.lisp4.net

8 LISP UpdateNANOG Brooklyn, June, 2008Slide 8 Internet Drafts draft-farinacci-lisp-07.txt draft-fuller-lisp-alt-02.txt draft-lewis-lisp-interworking-00.txt draft-farinacci-lisp-multicast-00.txt

9 LISP UpdateNANOG Brooklyn, June, 2008Slide 9


Download ppt "NANOG Brooklyn – June, 2008 Vince Fuller (for Dino, Dave, Darrel, et al) LISP Update"

Similar presentations


Ads by Google