2 Scanning Status SurveyGoalCurrent Total% Done POSS-II J897902100% POSS-II F897910100% POSS-II N89788098% AAO-SES606614100% PPARC-ER288 100% AAO-SR118 100% UKST-ST1125045% UKST-IR89476886% SERC-J/EJ44744399% POSS-I E106 100% POSS-I O35435938%

3 Scanning Machines Gamma I being used to scan 2 plates per day Gamma II still suffering from unknown problems

4 Currently Scanning IS plates – 86% complete XO plates – being scanned between shipments of IS plates – 38% complete

5 GSC-II Plate Processing Status SurveyGoalCurrent Total% Done POSS-I E93693199% POSS-QV61320% POSS-II J897 100% POSS-II F897 100% POSS-II N89730834% SERC-J/EJ89482993% South-F894 100% UKST-IR89439244% South-SR116 100% South-QV94 100% POSS-I O936152%

6 GSC-II Plate Processing Status IS, XI, and some XO plates currently being processed –IS survey is 44% complete –XI survey is 34% complete –XO survey is 2% complete –going slower due to loss of Fabrizia!

7 GSC-II Plate Processing Status No global recalibrations have been performed recently –A few plates have needed updating –All processed data now has the latest astrometry and photometry applied IV N (IS and XI) plates have not been loaded into the COMPASS database –This processed data has been written to tape and will be loaded at a later date

8 DSS-II Compression Status SurveyGoalCurrent Total% Done POSS-II J897 100% POSS-II F897 100% POSS-II N89774883% AAO SES606 100% PPARC ER288 100% AAO-SR118 100% UKST-IR89469778% POSS-I O9369410%

9 Currently Compressing XI Survey – 83% complete XO Survey – 10% complete IS Survey – 78% complete

10 Status of DSS Data Migration All DSS-I, DQVS, and DSS-II data to be moved to a raid array –will eventually serve a web page interface All of DSS-I and DQVS migrated Problems in migrating data –migration of DSS-II has been put on hold while technical issues are sorted out

11 Currently Available DSS Data Data being served to web page via a CD jukebox – jukebox and web page maintained by Archive Branch DSS-I, DQVS, and only part of DSS-II currently available online All headers completed, but not currently available online

12 Future Activities Complete scanning, processing, and compression of XI, XO, and IS surveys – Limited by telescope availability to complete observations Completion of DSS data migration and header availability Load all processed data onto COMPASS Perform any recalibration tasks to all data on the database side  Operational goals may need to be scaled back due to staffing and resource issues