Download presentation
Presentation is loading. Please wait.
Published byLewis Bailey Modified over 8 years ago
1
SIS – Simplified Interline Settlement SIS Overview RA44 – Plenary Gianna Monsch, aerwise
2
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary22 Introduction and Scope of Presentation The carriers defined the requirements of SIS What is Integrated Settlement A first look into IS-WEB Business Process changes are crucial – this is not a simple IT project Breakout Sessions – do not miss them !
3
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary3 SIS Steering Group & Working Groups
4
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary4 Working Groups Pax WG UA – Bob Portschy (Chair) AA – Leigh Boggs ACH – Lori Tully AF – Gilles Clochette BA – Matthew Holden BA – Györgyi Szantner DL – Harold Schwart DL – Lori Lien IB – Alfonso Arias Calderón IB – Virginia Polo LH – Michael Stulpe NZ – Antoinette Nelson SQ – Pei Shan Lim Cargo WG BA – Mary Pilides (chair) ACH – Lori Tully AC – Myrna Adams CO – Kasi Cotton LAN – Alejandra Jarufe Cortés LAN – Marcela Figueroa LH – Martina Kusch UA – Walter Wollemberg Miscellaneous WG LH – Michael Uebber (chair) AA – Christina Phillips AA – Chris Reynolds AF – Christine Pucheus AF – Muriel Meriot BA – Renuka Pankhania CA – Cheryl Stephen CA – Dawn Madden CO – Stacie Langham DL – Carol Davis LH – Sonja Kiefer KL – Rene Van Zandvoort RO – Adina Minculescu Bilbie UA – Bob Portschy UA – Riphanie Panganiban
5
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary5 Working Groups – Tasks Requirements: verification, clarification, etc Prototype Review – Screens (without functionality behind) (includes Pilot carriers and WG carriers) Alpha Test – Screens and Reports (incl. functionality) (includes Pilot carriers and WG carriers) Full system demonstration (includes Pilot carriers and WG carriers)
6
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary6 IS Integrated Settlement
7
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary7 SIS Overview Billed Entity Integrated Settlement Billing Entity Overall Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Overall Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC
8
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary8 Only the functionality is shown, which you are allowed to use (Member Profile – User – Roles - Permissions) Upcoming Milestones Alerts (from the system and additionally sent by email to this user) Messages from SIS-Operation On behalf of - SIS-Ops - ICH Ops - ACH Ops Announcements
9
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary9 Insight into IS (Integrated Settlement)
10
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary10 IS – Integrated Settlement Billed Entity Integrated Settlement Billing Entity Overall Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Overall Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC Billing & Invoicing Processes Billing Record DB
11
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary11 Billing and Invoicing Process IS-XML IS-IDEC Billing Record DB Supp. Doc. Usage File ATPCO Invoice PDF Billing Outward IS-WEB IS-XML IS-IDEC Supp. Doc. Supp. Doc. Digital Signature Validation & Correction (IS-WEB) Billing Carrier Billing Value Confirmation ATPCOATOS Interface ACH Interface ICH IS-WEB Validation Supp. Doc. Value Determination & Auto-Billing Digital Signature
12
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary12 IS-WEB - Various Processes Billing Record DB Member Administration IS-WEB Processing Dashboard Pax & Cargo Correspondence Web Analysis Reports Audit Trail
13
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary13
14
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary14
15
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary15
16
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary16
17
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary17 Correspondence is sent immediately Billed Entity Integrated Settlement Billing Entity Overall Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Overall Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC
18
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary18
19
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary19 Get Prepared for SIS !
20
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary20 SIS Overview Billed Entity Integrated Settlement Billing Entity Overall Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Overall Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC Introduction to SIS Tuesday, 14 September, 4pm – 6pm
21
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary21 SIS Breakout Sessions Billed Entity Integrated Settlement Billing Entity Overall Processes Billing & Invoicing Processes Central Repository “Digital Signature” Company Overall Processes Settlement Processes ICHACH Processes at time of Sales NFP engine ARC COMPASS™ Prorate Engine IS-WEB IS-XML IS-IDEC Usage File IS-WEB IS-XML IS-IDEC IS Functionality
22
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary22 SIS Breakout Sessions Technical Migration
23
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary23 SIS Breakout Sessions Migration More Info Journey through Migration CBT Profile updates User Guide Connectivity Testing SIS Participation Agreement
24
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary24 SIS Breakout Sessions Impact on Interline Billing Rules
25
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary25 Do not miss the Breakout Sessions on Wednesday SIS is not an option – it will be mandated ! Get prepared - NOW !
26
September 2010SIS P3 – Materials – RA44 SIS Overview Plenary26September 200826 Thank you. Email: sis@iata.org SIS Website: www.iata.org/sis www.iata.org/s
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.