Download presentation
Presentation is loading. Please wait.
Published byDina Goodman Modified over 9 years ago
1
October 14, 2008 C. Hauviller 1 Review of the mock-up’s C. Hauviller
2
October 14, 2008C. Hauviller2 Points to be treated Which mock-ups? Main beam, final focus, dedicated to an accelerator Breakdown of work and planning Advancement
3
October 14, 2008C. Hauviller3 Which mock-ups? Extracts from the List of Actions March 18, 2008 – –Overall design Linac (a demonstrator mock-up will have to be carried out by June 2010 – see action at the end of the list) … Final focus (no dedicated mock-up for FF will be done - special features to be integrated in the Linac mock-up) – –Integration of all the final focus features: types of supporting structures, coupling with vertex detector, forward detectors,… (LaVista) – –Integrate and apply to linac (LAPP, OXFORD, CERN, PSI (to be contacted by AJ)): A mock-up should be ready to provide results by June 2010 with several types of sensors including interferometers (intermediate milestones to be defined accordingly). The mock-up should perform better than required for main linac in order to “provide evidence” for final focus requirements. Mock-up to be integrated in CLEX (important to have the stabilization together with the alignment) or in other accelerators (Labs to be contacted by HS)
4
October 14, 2008C. Hauviller4 Mock-up’s June 10 Functionalities –Demonstrate stabilization in operation: Magnet powered, Cooling operating Configurations –1- Stand-alone, –2- Integrated in Module, –3- Interconnected Accelerator environment Parts / Measuring devices –Support –Pre-alignment –Stabilization –Magnet –Vacuum chamber and BPM –Independent measurement Critical items to-date –Specific magnet design and manufacturing. Vibrations –Cooling. Specific mock-up. –…
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.