Booster identification/disconnections Follow-up Enlarged project meeting, 11.12.2015 E. HARROUCH, EN-MEF, on behalf of the Injector De-cabling Project Team
2
Booster: YETS schedule 1 week less for identification labelling and disconnection Work in 2 shifts (6.00-14.00 for de-cabling project & 14.00-22.00 for EN-EL activities) Intervention stage 1 in week 50,51/2015 : 07/12 18/12 Intervention stage 2 in week 3,4/2016 : 18/01 29/01
3
New Dashboard for Booster Groupe Nombre de cableConnectéDeconnectéInconnuStatut EN-EL3003No DEC EN-MEF96000 EN-STI482379 TE-MSC12509629 TE-EPC8304736 TE-VSC1000 0 TE-MPE47055 TE-ABT254055199 BE-RF12200 BE-BI4430287156 BE-CO617 86035308274 IT-CS20000 No DEC GS-ASE1400 PH-LBD230 0 Others64800 No DEC Total3066379581044
4
Follow up tool SharePoint website : https://espace.cern.ch/Injector-De-Cabling-Project/SitePages/Booster%20Follow-Up.aspx Will be used to extract one DEC for all the groups Used by the project team on a daily basis to monitor the progress Please give us feedback 4G devices can be provided on demand (~120CHF / Device) to have internet in the booster