Download presentation
Presentation is loading. Please wait.
Published byAbigayle Jordan Modified over 9 years ago
1
doc.: IEEE 802.11-11/0471r0 Report March2011 Adrian Stephens, Intel CorporationSlide 1 802.11 March 2011 Closing Plenary Reports Date: 2011-03-17 Authors:
2
doc.: IEEE 802.11-11/0471r0 Report Abstract This document is a digest of the closing reports of all 802.11 sub-groups for presentation at the January 2011 closing plenary meeting. March 2011 Adrian Stephens, Intel CorporationSlide 2
3
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 3 March 2011 Publicity Date: 2011-03-16 Authors: from slide 1/2 of 11/415r0 by Stephen McCann, RIM March2011
4
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 4 Press release about recent published drafts –TGu 11-11-0365-00-0000-p802-11u-press-release.doc –TGv 11-11-0470-00-0000-p802-11v-press-release.doc –TGz 11-11-0xxx-00-0000-p802-11z-press-release.doc from slide 2/2 of 11/415r0 by Stephen McCann, RIM March2011
5
doc.: IEEE 802.11-11/0471r0 ReportSlide 5 802.11 WG Editor’s Meeting (Mar ‘11) Date: 2011-03-11 Authors: Adrian Stephens, Intel Corporation from slide 1/7 of 11/318r2 by Peter Ecclesine (Cisco Systems) March2011
6
doc.: IEEE 802.11-11/0471r0 ReportSlide 6 Volunteer Editor Contacts TGs – Kazuyuki Sakoda – KazuyukiA.Sakoda@jp.sony.comKazuyukiA.Sakoda@jp.sony.com TGmb – Adrian Stephens – adrian.p.stephens@intel.comadrian.p.stephens@intel.com TGaa – Alex Ashley – alex.ashley@hotmail.co.ukalex.ashley@hotmail.co.uk TGac – Robert Stacey – Robert.J.Stacey@intel.comRobert.J.Stacey@intel.com TGad – Carlos Cordeiro – carlos.cordeiro@intel.comcarlos.cordeiro@intel.com TGae – Henry Ptasinski – henryp@broadcom.comhenryp@broadcom.com TGaf – Peter Ecclesine – pecclesi@cisco.compecclesi@cisco.com TGah – Wongyu Song – wongyu.song@lge.comwongyu.song@lge.com TGai – Tom Siep – tom.siep@ieee.orgtom.siep@ieee.org Editors Emeritus: –TGk – Joe Kwak– joekwak@sbcglobal.netjoekwak@sbcglobal.net –TGp – Wayne Fisher – wfisher@arinc.comwfisher@arinc.com –TGr – Bill Marshall – wtm@research.att.comwtm@research.att.com –TGu – Necati Canpolat – necati.canpolat@intel.comnecati.canpolat@intel.com –TGv – Emily Qi – emily.h.qi@intel.comemily.h.qi@intel.com –TGw – Nancy Cam-Winget – ncamwing@cisco.comncamwing@cisco.com –TGz – Menzo Wentink – mwentink@qualcomm.commwentink@qualcomm.com Adrian Stephens, Intel Corporation from slide 2/7 of 11/318r2 by Peter Ecclesine (Cisco Systems) March2011
7
doc.: IEEE 802.11-11/0471r0 ReportSlide 7 ANA Announcements Current ANA announced to group is 802.11-11-0270r0. (2011 Feb 25) –See https://mentor.ieee.org/802.11/dcn/11/11-11-0270-00-0000-ana-database.xls https://mentor.ieee.org/802.11/dcn/11/11-11-0270-00-0000-ana-database.xls –All new requests received by end of meeting will be uploaded and announced via 802.11 WG reflector Procedure for ANA is contained in 07/0827r0. –See http://mentor.ieee.org/802.11/public/07/11-07-0827-00-0000-assigned-number-authority-ana-mechanisms.ppt http://mentor.ieee.org/802.11/public/07/11-07-0827-00-0000-assigned-number-authority-ana-mechanisms.ppt Editorial Guidance –ANA assignments should be done before the time of moving from WG LB to Sponsor ballot. –If a resource number is not in the ANA Database, please use in drafts! –Editors to replace any ANA controlled resources numbers with upon incorporation of material into drafts. –Editors need to check the ANA database to determine which resources are controlled and ensure that values are requested from the ANA. Adrian Stephens, Intel Corporation from slide 3/7 of 11/318r2 by Peter Ecclesine (Cisco Systems) March2011
8
doc.: IEEE 802.11-11/0471r0 Report ANA Report Recent allocations to TGad (1 item) and TGs (9 items) Two Behavior Limits released (reserved) by TGmb Two “temporary” values used by TGmb replaced by allocated values Reallocation of two values used by TGmb to avoid collision with published.11v Adrian Stephens, Intel CorporationSlide 8 from slide 4/7 of 11/318r2 by Peter Ecclesine (Cisco Systems) March2011
9
doc.: IEEE 802.11-11/0471r0 Report from slide 5/7 of 11/318r2 by Peter Ecclesine (Cisco Systems) Numbering Alignment Process Update from all published standards. Posted as 11- 08/644r20 (2011 Feb 17) By Kazuyuki Sakoda TGz-2010 started a new update cycle. 11v-2011, 11u- 2011, REVmb D7.03 numbering needs to be completed. 11ae is the next, then 11af, 11aa, 11ad, 11ac, 11ah, 11ai Create a working group MEC that includes numbering and ANA before going to Sponsor Ballot We use more columns for the two baselines. Slide 9Adrian Stephens, Intel Corporation March2011
10
doc.: IEEE 802.11-11/0471r0 Report 802.11 Style Guide See 11-09-1034-01-0000-wg11-style-guide.doc Editor’s responsibility includes checking the 2009 IEEE Standards Style Manual when creating or updating drafts. Call for interest to update this guide to match REVmb conventions Slide 10Adrian Stephens, Intel Corporation from slide 6/7 of 11/318r2 by Peter Ecclesine (Cisco Systems) March2011
11
doc.: IEEE 802.11-11/0471r0 Report Most current doc shaded green. TGPublished or Draft Baseline Documents SourceMEC Style GuideEditor Snapshot Date Publi shed smbaeafaaadaaadacah sY9.0Frame 8.0Yes2009Kazuyuki Sakoda15-Mar mbY7.03Frame 9.0Yes2009Adrian Stephens15-Mar ae6.02.0OpenOffic e 3.2 No2009Henry Ptasinski19-Jan af6.021.0Frame 9.0No2009Peter Ecclesine15-Mar aa7.0 1.00.063.0 1 WordNo2009Alex Ashley16-Mar ad2.0Word 2007 No2009Carlos Cordero15-Mar ac7.00.2Frame 9.0No2009Robert Stacey15-Mar ahWongyu Song aiTom Siep Changes from last report shown in red. Mar 2011 Draft Development Snapshot Slide 11Adrian Stephens, Intel Corporation from slide 7/7 of 11/318r2 by Peter Ecclesine (Cisco Systems) March2011
12
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 12 Closing Report Date: 2011-03-18 Authors: from slide 1/3 of 11/0472r0 by Clint Chaplin, Chair (Samsung) March2011
13
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 13 Abstract Closing report for WNG SC for March 2011, Singapore from slide 2/3 of 11/0472r0 by Clint Chaplin, Chair (Samsung) March2011
14
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 14 Presentations at March 2011 meeting –802.11 WNG Presentation on the use of UWB spectrum for 802.11 (11-11- 0385-00-0wng-ultrwideband-spectrum-for-802-11.ppt) – Jim Lansford –Lawrence Zimmermann (http://www.ieee802.org/11/Documents/DocumentArchives/1994_docs/11941 32.DOC Minutes –11-11-0393-00-0wng-march-2011-meeting-minutes.doc Plans for May 2011 –1 2 hour session from slide 3/3 of 11/0472r0 by Clint Chaplin, Chair (Samsung) March2011
15
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 15 March 2011 Closing Report -TGmb Date: 2011-03-17 Authors: from slide 1/6 of 11/454r0 by Dorothy Stanley (Aruba Networks) March2011
16
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 16 Abstract This document contains the TGmb closing report for March 2011. from slide 2/6 of 11/454r0 by Dorothy Stanley (Aruba Networks) March2011
17
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 17 Accomplishments Completed Initial Recirculation SB Comment Resolution (D7.0) –178 comments + 11u +11v –Second Recirculation SB (20 day) to start shortly Scheduled Teleconference calls on –April 29, May 6 –10am Eastern (7am Pacific) Timeline Analysis –No change from plan that 11mb will incorporate 11s –Revisit in May from slide 3/6 of 11/454r0 by Dorothy Stanley (Aruba Networks) March2011
18
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 18 Current TGmb Plan of Record May 2008 – Issue Call for Comment/Input July 2008 – begin process input and old Interpretation requests Acknowledge previous Task Group referrals Sept 2008 – PAR revision process started Nov 2008 – close receipt of new input Nov 2008 – WG/EC approval of PAR Revision Dec 2008 – NesCom/SASB approval PAR Revision May 2009 – First WG Letter ballot Nov 2009 – Recirc start July 2010 – Conditional Sponsor Ballot Approval from EC August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14 November 2010 – Initial Sponsor Ballot completion Jan 2011 – Sponsor Recirc. Start Nov 2011 – WG/EC Final Approval March 2012 – RevCom/SASB Approval from slide 4/6 of 11/454r0 by Dorothy Stanley (Aruba Networks) March2011
19
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 19 Goals for March Recirculation Sponsor Ballot comment resolution (D8.0) from slide 5/6 of 11/454r0 by Dorothy Stanley (Aruba Networks) March2011
20
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 20 References from slide 6/6 of 11/454r0 by Dorothy Stanley (Aruba Networks) March2011
21
doc.: IEEE 802.11-11/0471r0 Report Adrian Stephens, Intel Corporation Slide 21 TGs Singapore Closing Report Date: 2011-03-17 Author: NameAddressAffiliationPhoneEmail Guido R. Hiertz Riedel Communications GmbH & Co. KG, Uellendahler Straße 353, 42109 Wuppertal, Federal Republic of Germany Philips+49-202- 292-9987 hiertz@ieee.org from slide 1/5 of 11/0468r0 by Guido R. Hiertz (Philips) March2011
22
doc.: IEEE 802.11-11/0471r0 Report Adrian Stephens, Intel Corporation Slide 22 Abstract TGs closing report for the March 2011 meeting. from slide 2/5 of 11/0468r0 by Guido R. Hiertz (Philips) March2011
23
doc.: IEEE 802.11-11/0471r0 Report Adrian Stephens, Intel Corporation Slide 23 Status Before meeting TGs passed its second recirculation based on Draft 9.0 with 95.0% approval rate (closed: 2011-03-05) We received 291 comments 5 general comments 142 editorial comments 144 technical comments During meeting The group resolved all comments The group approved the third SB recirculation from slide 3/5 of 11/0468r0 by Guido R. Hiertz (Philips) March2011
24
doc.: IEEE 802.11-11/0471r0 Report IEEE 802 Tutorial TGs presented a tutorial on 802.11s D9.0 –2011-03-14, 19:30 – 21:00 –Well attended –Good discussion ~5 attendees asked detailed questions 20 min to 25 min discussion –Available in 11-11-0380-00-000s from https://mentor.ieee.org/802.11/documents March 2011 Slide 24Adrian Stephens, Intel Corporation from slide 4/5 of 11/0468r0 by Guido R. Hiertz (Philips) March2011
25
doc.: IEEE 802.11-11/0471r0 Report Adrian Stephens, Intel Corporation Slide 25 Timeline review TGs reviewed the timeline TGs is aware of the need for fast progress TGs works hard to finish early to be included in 802.11-2012 Currently envisaged scenariodate RecirculationMarch 2011 SB Ballot on draft 112011-04-20 SB Ballot on unchanged draft 112011-05-21 Request EC Unconditional Approval to go to Revcom 2011-07-22 Revcom approvalSeptember 2011 PublicationSeptember 2011 from slide 5/5 of 11/0468r0 by Guido R. Hiertz (Philips) March2011
26
doc.: IEEE 802.11-11/0471r0 Report 802.11aa – Robust Audio Video Transport Streaming Singapore Closing Report Date: 2011-03-17 Authors: Adrian Stephens, Intel CorporationSlide 26 from slide 1/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al March2011
27
doc.: IEEE 802.11-11/0471r0 Report Technical Presentations Adrian Stephens, Intel CorporationSlide 27 Document numberTitleAuthor(s) 111/288r0, 11/289r0SCS Comment ResolutionsAlex Ashley 211/300r0GCR Comment ResolutionsAlex Ashley 311/324r2Interworking Comment ResolutionsGanesh Venkatesan 411/283r0Editorial Comment ResolutionsAlex Ashley 511/360r0OBSS-MLME Comment ResolutionsAlex Ashley 7 11/292r0, 11/293r2, 11/294r0 Support for GCR coded BA using Overlay FEC Jochen Miroll 811/168r2Joint Meeting with 802.1AVBGanesh Venkatesan 911/426r0CID #2096 resolutionQi Wang from slide 2/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al March2011
28
doc.: IEEE 802.11-11/0471r0 Report LB174 Comment Resolution Status unresolved AcceptPrincipleDeclined Total Approved_Editor 01682815211 Approved_GCR 011681897 Approved_General 016521 Approved_Interworki ng 44210 Approved_OBSS 01933557 Approved_SCS 0713525 Total 022515145421 Completed % 100% Adrian Stephens, Intel CorporationSlide 28 from slide 3/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al March2011
29
doc.: IEEE 802.11-11/0471r0 Report Joint Meeting with 802.1AVB Adrian Stephens, Intel CorporationSlide 29 1.QoS Maintenance Reports Are there additional statistics that are not covered by 802.11k/v? 2.Overview of.11aa features 3.MaxRes (not in scope for.11aa) what would be the default bandwidth value (25% of the potential bandwidth?) what would be min link latency (20ms, 100ms, seconds?) MaxRes is described in 802.1BA and in P1722 4.STA-Bridge Issue (not in scope for.11aa): An ad hoc group (of 802.11/802.1AVB) that will create a presentation on the STA-Bridge problem and bring it to WNG from slide 4/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al March2011
30
doc.: IEEE 802.11-11/0471r0 Report Teleconferences Weekly Monday 1130-1230 Hrs ET Mar 28, Apr 04, 11, 18 2011 Adrian Stephens, Intel CorporationSlide 30 from slide 5/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al March2011
31
doc.: IEEE 802.11-11/0471r0 Report Plans for May 2011 meeting Resolve Recirculation 3 LB Comments Complete Draft5.0 and start recirculation Form Sponsor Pool Adrian Stephens, Intel CorporationSlide 31 from slide 6/6 of 11/0430r0 by Ganesh Venkatesan, Intel Corporation et al March2011
32
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 32 TGac March 2011 Closing Report Date: 2011-03-17 Authors: from slide 1/6 of 11/0463r1 by Osama Aboul-Magd (Samsung) March2011
33
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 33 Abstract This document is the closing report for the TGac for the March 2011 session. from slide 2/6 of 11/0463r1 by Osama Aboul-Magd (Samsung) March2011
34
doc.: IEEE 802.11-11/0471r0 Report Work Completed Resolutions were approved for 232 (28.5%) technical comments. Resolutions were discussed for many other comments and approvals were deferred for further review New revision of the draft (D0.3) will include approved resolutions. Comments spreadsheet is available in 11-11-0276r6 Meeting Minutes are available in 11-11-461r0. Agenda is available in 11-11-290r4. Adrian Stephens, Intel CorporationSlide 34 Comment TypeReceivedApproved Resolutions Editorial1000Assigned to the Editor Technical814232 from slide 3/6 of 11/0463r1 by Osama Aboul-Magd (Samsung) March2011
35
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 35 March 2011 Goals Continue with Draft D0.1 comments resolution. Prepare TG draft D1.0 Start WG Letter Ballot from slide 4/6 of 11/0463r1 by Osama Aboul-Magd (Samsung) March2011
36
doc.: IEEE 802.11-11/0471r0 Report TG Ad Hoc Meeting in May Request the WG to approve an ad hoc meeting of TGac in the Bay Area, California on May 3-5, 2011 to advance the TGac draft prior to the May IEEE 802 Wireless Interim. Adrian Stephens, Intel CorporationSlide 36 from slide 5/6 of 11/0463r1 by Osama Aboul-Magd (Samsung) March2011
37
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 37 Conference Call Times March 31, April 14, April 28, –20:00 – 22:00 ET April 7, April 21 –10:00 – 12:00 ET from slide 6/6 of 11/0463r1 by Osama Aboul-Magd (Samsung) March2011
38
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 38 TGad March 2011 Closing Report Date: 2011-03-17 Authors: from slide 1/5 of 11/0331r0 by Eldad Perahia, Intel Corporation March2011
39
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 39 Abstract This document is the closing report for TGad for the March 2011 session. from slide 2/5 of 11/0331r0 by Eldad Perahia, Intel Corporation March2011
40
doc.: IEEE 802.11-11/0471r0 Report Work Completed Resolved all comments on LB 168 this week TG and WG approved motion for recirculation letter ballot on D2.0 –D2.0 is in the members area Provided comments to WG on 802.15 PSC PAR & 5C’s Adrian Stephens, Intel CorporationSlide 40 from slide 3/5 of 11/0331r0 by Eldad Perahia, Intel Corporation March2011
41
doc.: IEEE 802.11-11/0471r0 Report Goals for May 2011 Comment resolution on D2.0 Adrian Stephens, Intel CorporationSlide 41 from slide 4/5 of 11/0331r0 by Eldad Perahia, Intel Corporation March2011
42
doc.: IEEE 802.11-11/0471r0 Report Conference call times Previously approved conference calls –Mar 31, Apr 14 10:00 – 12:00 ET –Mar 24, Apr 7 20:00-22:00 ET New conference calls –Not overlap with TGac –Apr 28, May 5, May 26, Jun 9 10:00 – 12:00 ET –Apr 21, May 19, Jun 2, Jun 16 20:00-22:00 ET Adrian Stephens, Intel CorporationSlide 42 from slide 5/5 of 11/0331r0 by Eldad Perahia, Intel Corporation March2011
43
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 43 TGae Closing Report – March 2011 Date: 2011-03-17 Authors: from slide 1/5 of 11/0466r0 by Michael Montemurro, Research In Motion March2011
44
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 44 Abstract This document is the closing report for the TGae Task Group for the March 2011 session. from slide 2/5 of 11/0466r0 by Michael Montemurro, Research In Motion March2011
45
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 45 Work Completed Matthew Fischer has agreed to become TG Secretary. Completed Comment Resolution for LB 172 –https://mentor.ieee.org/802.11/dcn/11/11-11-0255-03-00ae-tgae-lb-172-comment- resolutions.xlshttps://mentor.ieee.org/802.11/dcn/11/11-11-0255-03-00ae-tgae-lb-172-comment- resolutions.xls Motion to approve recirculation LB Teleconferences: –Wednesday Apr 20, 27 and May 4, at 11am ET for 1 hour. from slide 3/5 of 11/0466r0 by Michael Montemurro, Research In Motion March2011
46
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 46 TGae Timeline – March 2011 Initial Working Group Letter Ballot: September ‘10 Re-circulation Working Group Letter Ballot: January ‘11 Form Sponsor Ballot Pool: May ’11 Mandatory Editorial Check: May ’11 Initial Sponsor Ballot: July ’11 Sponsor Ballot Recirculation: Sep ‘11 Final WG/EC Approval: Nov ‘11 RevCom/Standards Board Approval: March ‘12 from slide 4/5 of 11/0466r0 by Michael Montemurro, Research In Motion March2011
47
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 47 May 2011 Goals Find Secretary for TGae Resolve comments from recirculation LB on D3.0 Prepare for recirculation letter ballot from slide 5/5 of 11/0466r0 by Michael Montemurro, Research In Motion March2011
48
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 48 IEEE 802.11 TGaf Singapore Closing Report Date: 2011-03-18 Authors: from slide 1/7 of 11/0455r1 by Rich Kennedy, Research In Motion March2011
49
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 49 Abstract This presentation is the closing report for the ninth face- to-face meeting of IEEE 802.11 TGaf taking place the week of March 14, 2011 at the IEEE 802 Plenary in Singapore. from slide 2/7 of 11/0455r1 by Rich Kennedy, Research In Motion March2011
50
doc.: IEEE 802.11-11/0471r0 Report Agenda Review the results of LB171 Approve the LB171 comment spreadsheet in 11-11/277r3 Review FCC database administrators workshop presentation in https://mentor.ieee.org/802.18/dcn/11/18-11-0029-00-0000-fcc-tv- bands-administrator-workshop.pdf https://mentor.ieee.org/802.18/dcn/11/18-11-0029-00-0000-fcc-tv- bands-administrator-workshop.pdf Review Andy Gowans presentation on D1.0 and the Ofcom DD plan Comment resolution Plan for May meeting, including an ad hoc the week prior, and teleconferences Adrian Stephens, Intel CorporationSlide 50 from slide 3/7 of 11/0455r1 by Rich Kennedy, Research In Motion March2011
51
doc.: IEEE 802.11-11/0471r0 Report TGaf Accomplishments Reviewed results of LB 171 Began Comment resolution Planned for May ad hoc, and extended weekly teleconferences to 3 hours –Still begin Tuesdays at 22:00 ET Adrian Stephens, Intel CorporationSlide 51 from slide 4/7 of 11/0455r1 by Rich Kennedy, Research In Motion March2011
52
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 52 TGaf Timeline – Updated March 2011 New Initial Working Group Letter Ballot: January 2011 Second Working Group Letter Ballot: May 2011 Recirculation Letter Ballot: July 2011 Form Sponsor Ballot Pool: February 2012 Initial Sponsor Ballot: March 2012 Recirculate Sponsor Ballot: May 2012 Final WG/EC Approval: July 2012 RevCom/Standards Board Approval: September 2012 from slide 5/7 of 11/0455r1 by Rich Kennedy, Research In Motion March2011
53
doc.: IEEE 802.11-11/0471r0 Report Plans for May Ad hoc May 4 - 6 in the Bay Area Continue comment resolution Adrian Stephens, Intel CorporationSlide 53 from slide 6/7 of 11/0455r1 by Rich Kennedy, Research In Motion March2011
54
doc.: IEEE 802.11-11/0471r0 Report Teleconferences Weekly on Tuesdays: Time: 22:00 ET for 180 minutes Adrian Stephens, Intel CorporationSlide 54 from slide 7/7 of 11/0455r1 by Rich Kennedy, Research In Motion March2011
55
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 55 IEEE 802.11ah Closing Report for March 2011 Date: 2011-3-17 Authors: from slide 1/4 of 11/0460r0 by David Halasz, OakTree Wireless March2011
56
doc.: IEEE 802.11-11/0471r0 Report Activity in TGah Adopted 11/239r2 as TGah Selection Procedure –Use Case, Channel Model, Requirements and Specification framework documents are required Use Case and Channel model submissions made Adopted initial Use Cases document, see 11/457 Update timeline, see 11/285r0 Additional leadership roles –Minho Cheong to Chair Ad Hoc Requirements Group –Minyoung Park To Chair Ad Hoc Specification Framework Group Adrian Stephens, Intel CorporationSlide 56 from slide 2/4 of 11/0460r0 by David Halasz, OakTree Wireless March2011
57
doc.: IEEE 802.11-11/0471r0 Report Going forward Start on requirements and specification framework documents Follow up on required guiding documents Adrian Stephens, Intel CorporationSlide 57 from slide 3/4 of 11/0460r0 by David Halasz, OakTree Wireless March2011
58
doc.: IEEE 802.11-11/0471r0 Report Teleconferences March 28, 21:30 US ET, 1.5 hours April 4, 21:30 US ET, 1.5 hours April 11, 21:30 US ET, 1.5 hours April 18, 21:30 US ET, 1.5 hours April 25, 21:30 US ET, 1.5 hours May 2, 21:30 US ET, 1.5 hours Adrian Stephens, Intel CorporationSlide 58 from slide 4/4 of 11/0460r0 by David Halasz, OakTree Wireless March2011
59
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 59 IEEE 802.11TGai Closing Report Date: 2011-03-17 Authors: NameCompanyAddressPhoneemail Hiroshi MANOROOT Inc.8F TOC2 Bldg. 7-21-11 Nishi- Gotanda, Shinagawa-ku, Tokyo 141-0031 JAPAN +81-3-5719-7630hmano@root-hq.com Marc EmmelmannFraunhofer FOKUS Kaiserin-Augusta-Alle 31 10589 Berlin Germany +49-30-3463 7268 emmelmann@ieee.org from slide 1/13 of 11/0464r0 by Hiroshi Mano (Root Inc.) March2011
60
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 60 Abstract This presentation is the closing report for the Singapore meeting of the IEEE 802.11 TGai. from slide 2/13 of 11/0464r0 by Hiroshi Mano (Root Inc.) March2011
61
doc.: IEEE 802.11-11/0471r0 Report Agenda for this week March 2011, Singapore Official agenda of WG –Monday PM1 –Tuesday PM1, EVE –Wednesday AM1,AM2 –Thursday PM1 Goals for the Meeting: –Review and Approve the Los Angels and Teleconference meeting minutes –Presentation of submissions Draft use case scenario documentation –TIME line of task group –Plan for May & Teleconference February Adrian Stephens, Intel CorporationSlide 61 from slide 3/13 of 11/0464r0 by Hiroshi Mano, Root Inc March2011
62
doc.: IEEE 802.11-11/0471r0 Report Accomplishments TGai 1/3 Submission of Presentation –0357/00 A focused path forwad Tgai D1.0 –0334/00 TGai scope discussion (A. Yamada/ NTT Docomo) –0326/00 Use-Case-Reference-List-doc discussion (Tom Siep / CSR) –0148/06 Use cases for TGai Lee Armstrong (US DoT) –0281/00 Proposed Dynamic Mobility Use Cases for TGai (Carl Kain / Nobils) –0333/00 TGai possible use cases (A. Yamada/ NTT Docomo) –0337/00 discussion-points-on-portal-locations (Dwight Smith,Motorola Mobility) –0356/01 Selection Procedure for TGai (Y. Nagai Mitsubishi Electric) Adrian Stephens, Intel CorporationSlide 62 from slide 4/13 of 11/0464r0 by Hiroshi Mano (Root Inc.) March2011
63
doc.: IEEE 802.11-11/0471r0 Report Accomplishments TGai 2/3 Submission of Presentation –0343/00 Pedestrian model (Hitoshi Morioka, Root Inc.) –0408/00 Use Case Characteristics discussion (Tom Siep / CSR) –0238/04 Use Case Documentation (Tom Siep /CSR) –0435/00 Definition of terminology from 802.11.2 (Marc Emmelman /Fokus) –0408/01 Use Case Characteristics discussion (Tom Siep / CSR) –0441/00 Self growing use cases requiring fast link set up (Marc Emmelman Fokus) –0238/05 Use Case Documentation (Tom Siep /CSR) March 2011 Adrian Stephens, Intel CorporationSlide 63 from slide 5/13 of 11/0464r0 by Hiroshi Mano (Root Inc.) March2011
64
doc.: IEEE 802.11-11/0471r0 Report Accomplishments 3/3 TGai Reviewed and Approved the Los Angels and Teleconference meeting minutes Drafting Use Case Scenario documentation –Approve the terms and definitions in 11-11/0408r2 as official TGai terminology. –Approve the values of high/medium/low given for each definition as in the 11-11/0408r2. Approved Weekly Teleconference schedule Approved Plan for May –Finish the use case scenario –Finish the functional requirement –Finish the technical requirement Adrian Stephens, Intel CorporationSlide 64 from slide 6/13 of 11/0464r0 by Hiroshi Mano (Root Inc.) March2011
65
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 65 Motion: Motion: Approve the terms and definitions in 11- 11/0408r2 as official TGai terminology. Moved :Tom Siep (CSR) Second: Lee Armstrong (US DOT) Result 14-0-1 Passed from slide 7/13 of 11/0464r0 by Tom Siep, CSR March2011
66
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 66 Motion: Motion: Approve the values of high/medium/low given for each definition as in the 11-11/0408r2. Moved :Tom Siep (CSR) Second: Lee Armstrong (US DOT) Result 10-0-3 Passed from slide 8/13 of 11/0464r0 by Tom Siep, CSR March2011
67
doc.: IEEE 802.11-11/0471r0 Report Teleconference Schedule Motion: –Approve the following schedule of weekly teleconferences. –Tuesdays 08:00 EST (NY Time) continue until 29th Mar. –Tuesdays 09:00 EST (NY Time) start from 5 th Apr. –Duration 1Hour –Using WEB-EX that will be provided by Task Group Chair Moved: Marc Emmelmann ( Fokus ), Seconded: Dwight Smith (Motorola Mobility) Result: 14-0-3 Motion passed March 2011 Adrian Stephens, Intel CorporationSlide 67 from slide 9/13 of 11/0464r0 by Hiroshi Mano (Root Inc.) March2011
68
doc.: IEEE 802.11-11/0471r0 Report Time line of TGai to draft 1.0 Use case scenario finished May 2011 Functional RequirementMay 2011 Technical Requirement finishedMay 2011 Call for Proposal startMay 2011 Proposal submission closeJul 2011 Evaluation and down selection proposal, Jul11 to Sep 11 March 2011 Adrian Stephens, Intel CorporationSlide 68 from slide 10/13 of 11/0464r0 by Hiroshi Mano (Root Inc.) March2011
69
doc.: IEEE 802.11-11/0471r0 Report Time line of TGai –WG Letter Ballots Initial / RecircSep 11 / Jan 12 –Form Sponsor Ballot Pool / ReformJul 12 –MEC DoneJul 12 –IEEE-SA Sponsor Ballots Initial / RecircSep 12 / Dec 12 –Final 802.11 WG ApprovalJul 13 –Final or Conditional 802 EC ApprovalJul 13 –RevCom & Standards Board Final or Continuous Process Approval Sep 13 –ANSI ApprovedN/A Adrian Stephens, Intel CorporationSlide 69 from slide 11/13 of 11/0464r0 by Hiroshi Mano (Root Inc.) March2011
70
doc.: IEEE 802.11-11/0471r0 Report Documents Approved Minutes –11-11-0115-01-00ai-tgai-meeting-minutes-for-the-ieee-802-11- january-2011-interim.doc –11-11-0213-06-00ai-january-march-teleconference-minutes.doc Adrian Stephens, Intel CorporationSlide 70 from slide 12/13 of 11/0464r0 by Hiroshi Mano (Root Inc.) March2011
71
doc.: IEEE 802.11-11/0471r0 Report Thanks to all who participated! Adrian Stephens, Intel CorporationSlide 71 from slide 13/13 of 11/0464r0 by Hiroshi Mano (Root Inc.) March2011
72
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 72 JTC1 ad hoc closing report (March 11) Date: 2011-3-11 Authors: from slide 1/9 of 11/0467r0 by Andrew Myles, Cisco March2011
73
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 73 Abstract Closing report for JTC1 ad hoc for March 2011, Singapore from slide 2/9 of 11/0467r0 by Andrew Myles, Cisco March2011
74
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 74 JTC1 ad hoc generated a number of liaisons in Mar 2011 Progress in Singapore (March 2011) –Review extended goals The ad hoc is now responsible for 802 matters –Review status of liaisons previously sent to SC6 No comments on any Sponsor Ballot drafts –Discuss identifier conflict liaison previously sent to SC6 Considered responses from Chinese and Swiss NBs Developed liaison offering a new IE and two new status codes –Update on status of ISO/IEC 8802-11:2005 Likely to be reconfirmed based on ballot –Update on status of ISO/IEC 8802-3:2000 Likely to withdrawn based on liaison from IEEE 802.3 from slide 3/9 of 11/0467r0 by Andrew Myles, Cisco March2011
75
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 75 JTC1 ad hoc generated a number of liaisons in Mar 2011 Progress in Singapore (March 2011) –Update on WAPI progress Late breaking news: IEEE 802 comments objecting to claims that IEEE 802.11i is insecure have been rejected as irrelevant in proposed comment disposition submission. Similar comments from US NB also rejected. –Discuss a proposed 802.1X/AE related liaison Developed liaison inviting SC6 members to attend 802.1 WG in July, and included analysis on proposed NP for replacement of.1X/AE Was discussed in 802.1 closing plenary –Approve delegation for next SC6 meeting Recommended Bruce Kraemer be appointed head of delegation Bruce authorised to select other candidates from slide 4/9 of 11/0467r0 by Andrew Myles, Cisco March2011
76
doc.: IEEE 802.11-11/0471r0 Report JTC1 ad hoc will prepare for more liaisons out of Singapore meeting Plans for Palm Springs (May 2011) –Prepare ppt versions of recent liaisons to SC6 –Develop liaison on proposed.11 replacement NP –Possibly develop liaison on proposed.16 security replacement NP –Review latest response to liaison related to security of IEEE 802.11i –Confirm delegation to SC6 Likely to include 802.11, 802.1 and maybe 802.16 members Adrian Stephens, Intel CorporationSlide 76 from slide 5/9 of 11/0467r0 by Andrew Myles, Cisco March2011
77
doc.: IEEE 802.11-11/0471r0 Report Motion to appoint HoD to SC6 meeting The JTC1 ad hoc unanimously approved a motion to appoint HoD to SC6 meeting –The IEEE 802 JTC1 ad hoc recommends to IEEE 802 ExCom that Bruce Kraemer be appointed Head of Delegation of the IEEE 802 delegation to the SC6 meeting in San Diego in June 2011. The ad hoc also recommends that as Head of Delegation that he have the authority to add other interested parties to the delegation IEEE 802.11 WG should consider an equivalent motion –The IEEE 802.11 WG recommends to IEEE 802 ExCom that Bruce Kraemer be appointed Head of Delegation of the IEEE 802 delegation to the SC6 meeting in San Diego in June 2011. The WG also recommends that as Head of Delegation that he have the authority to add other interested parties to the delegation Adrian Stephens, Intel CorporationSlide 77 from slide 6/9 of 11/0467r0 by Andrew Myles, Cisco March2011
78
doc.: IEEE 802.11-11/0471r0 Report Motion to allocate an IE identifier and two status codes The JTC1 ad hoc unanimously approved a motion to allocate an IE identifier and two status codes –The IEEE 802 JTC1 ad hoc recommends to the IEEE 802.11 ANA that two status codes and an IE identifier be allocated for use by ISO/IEC JTC1/SC6/WG1 in the proposed WAPI standard IEEE 802.11 WG should consider an equivalent motion –The IEEE 802.11 WG approves the IEEE 802.11 ANA allocating two status codes and an IE identifier for use by ISO/IEC JTC1/SC6/WG1 in the proposed WAPI standard Adrian Stephens, Intel CorporationSlide 78 from slide 7/9 of 11/0467r0 by Andrew Myles, Cisco March2011
79
doc.: IEEE 802.11-11/0471r0 Report Motion for identifier conflict liaison to SC6 The JTC1 ad hoc unanimously approved a motion for a liaison to SC6 in relation to the identifier conflict issue –The IEEE 802 JTC1 ad hoc recommends to the IEEE 802.11 WG, IEEE 802 ExCom and IEEE International ad hoc that: The content of 11-11-404r0 be sent to ISO/IEC JTC1/SC6 with an appropriate cover letter11-11-404r0 Bruce Kraemer be given authority to make editorial changes, including the insertion of allocated ANA values IEEE 802.11 WG should consider an equivalent motion –IEEE 802.11 WG recommends to IEEE 802 ExCom and IEEE International ad hoc that: The content of 11-11-404r0 be sent to ISO/IEC JTC1/SC6 with an appropriate cover letter11-11-404r0 Bruce Kraemer be given authority to make editorial changes, including the insertion of allocated ANA values Adrian Stephens, Intel CorporationSlide 79 from slide 8/9 of 11/0467r0 by Andrew Myles, Cisco March2011
80
doc.: IEEE 802.11-11/0471r0 Report Motion for 1X/1AE liaison to SC6 The JTC1 ad hoc unanimously approved a motion for a liaison to SC6 in relation to 1X/1AE –The IEEE 802 JTC1 ad hoc recommends to the IEEE 802.11 WG, IEEE 802 ExCom and IEEE International ad hoc that: The content of 11-11-442r1 be sent to ISO/IEC JTC1/SC6 with an appropriate cover letter11-11-442r1 Paul Nikolich be given authority to make editorial changes IEEE 802.11 WG should consider an equivalent motion –The IEEE 802.11 WG recommends to IEEE 802 ExCom and IEEE International ad hoc that: The content of 11-11-442r1 be sent to ISO/IEC JTC1/SC6 with an appropriate cover letter11-11-442r1 Paul Nikolich be given authority to make editorial changes Adrian Stephens, Intel CorporationSlide 80 from slide 9/9 of 11/0467r0 by Andrew Myles, Cisco March2011
81
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 81 IEEE 802.11 Regulatory Ad Hoc Committee Closing Report Date: 2011-03-18 Authors: from slide 1/4 of 11/0456r0 by Rich Kennedy, Research In Motion March2011
82
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 82 Abstract This presentation is the closing report for the Singapore 2011 meeting of the IEEE 802.11 Regulatory Ad Hoc Committee. from slide 2/4 of 11/0456r0 by Rich Kennedy, Research In Motion March2011
83
doc.: IEEE 802.11-11/0471r0 Report Agenda The regulatory summaries Regulatory issues status –The end of FCC 10-174 –FCC 5 GHz rules changes update Critical issues actions –Coming regulations for mobile hoptspots Slide 83Adrian Stephens, Intel Corporation from slide 3/4 of 11/0456r0 by Rich Kennedy, Research In Motion March2011
84
doc.: IEEE 802.11-11/0471r0 Report Regulatory AHC Activities Discussed regulatory summaries from North America and the EU –FCC 10-174 is now the final rules for the TVWS untill a new rulemaking Reviewed Ofcom document about TVWS issues in the UK and EU Adrian Stephens, Intel CorporationSlide 84 from slide 4/4 of 11/0456r0 by Rich Kennedy, Research In Motion March2011
85
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 85 Smart Grid ad hoc – March 2011 Date: 15 March 2011 NameCompanyAddressPhoneemail Bruce KraemerMarvell5488 Marvell Lane, Santa Clara, CA, 95054 +1-321-751-3988bkraemer@marvell.com from slide 1/3 of 11/0469r0 by Bruce Kraemer, Marvell March2011
86
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 86 Smart Grid – March 2011 Tuesday & Thursday topics UK Consultation Update of activities in P2030 IEEE Smart Grid FERC Australian Smart Metering RFI Revision NIST Smart Grid PAP#2 Report plan Open SG ITU-R paper - WP1A document from slide 2/3 of 11/0469r0 by Bruce Kraemer, Marvell March2011
87
doc.: IEEE 802.11-11/0471r0 ReportAdrian Stephens, Intel CorporationSlide 87 Deliverables Paper & Matrix 1.Identify and fully define all necessary terminology (mesh, etc.) 2.Come up with sane metric definitions for Section 4 3.Come up with guidelines for filling out the wireless technologies matrix to make sure entries are comparable across technologies –This includes a selection of high priority, fully described “operating points” representing deployment scenarios 4.Come up with dates for submissions for column entries for the matrix and appoint coordinators for each technology represented in the matrix 5.Submit results to the PAP2 reflector and announce a comment period 6.Directly solicit SDO participation and schedule SDO calls to discuss submissions and comments on all of the above – Bluetooth, 7.Discuss & adjust the deliverables content using OpenSG as the venue and a proxy for the utility industry 8.Completion target: July? December? 9.Assessment of industry practices in deployment from slide 3/3 of 11/0469r0 by Bruce Kraemer, Marvell March2011
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.