Download presentation
Presentation is loading. Please wait.
Published byCoral Barton Modified over 8 years ago
1
I TEM F8 B – C ONSISTENCY D ETERMINATION CD-0003-15 C ALIFORNIA C OASTAL C OMMISSION E NERGY, O CEAN R ESOURCES AND F EDERAL C ONSISTENCY D IVISION S LIDE 1
2
I TEM F8 B – C ONSISTENCY D ETERMINATION CD-0003-15S LIDE 2 P ROJECT L OCATION
3
I TEM F8 B – C ONSISTENCY D ETERMINATION CD-0003-15S LIDE 3 LRDP P HASE 1 P ROJECTS
4
I TEM F8 B – C ONSISTENCY D ETERMINATION CD-0003-15S LIDE 4 P HASE 1 P ARKING C HANGES New parking (+627 spaces) Net addition of 306 parking spaces
5
I TEM F8 B – C ONSISTENCY D ETERMINATION CD-0003-15S LIDE 5 C OASTAL V IEWS View of the existing structure (with story poles showing new roof line) looking inland from the blufftop CCT Before Project After Project (simulated) View of SFVAMC campus looking to the southwest from Lincoln Blvd., in the Presidio, near the Golden Gate Bridge
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.