1 Interconnections Cryogenic Extensions and DSL Ivo Slits - AT/MCS 08.11.2006

2 Ivo Slits, AT/MCS-IC, 08.11.20062 Introduction A cryogenic extension allows to link the QRL jumpers to different clients (DFBA, DFBL, Q6, ACS). The diameter of the cryogenic extensions is 355.6 mm QRLXD-Q6 - 8R - QRLXE-DFBLA - 1L - QRLXH-Cavité - 4L - Q6 Jumper QRL DFBL Cavité Jumper QRL

3 Ivo Slits, AT/MCS-IC, 08.11.20063 Introduction They are composed of several interconnection pipes (between 4 and 9 pipes) with different internal diameters (from 10 mm to 80 mm) Interface of the cryogenic extension element QRLXD (sector 8-1) Interface of the cryogenic extension element QRLXE (sector 8-1)

4 Ivo Slits, AT/MCS-IC, 08.11.20064 QRLXE with DFBLA (1L) DFBLA Jumper QRL MLIPersistant ring MLI

5 Ivo Slits, AT/MCS-IC, 08.11.20065 Overview of cryogenic extensions

6 Ivo Slits, AT/MCS-IC, 08.11.20066 Activities and responsibilities Design and Manufacturing of elements and external supports => AT-ACR / Airliquide Installation of ext. support and elements => AT-ACR Interconnection drawings, some IC components (welding rings and MLI), tooling and interconnection activities in tunnel with IEG => AT-MCS Leak-testing => AT-VAC Final testing (pressure/cold test) => AT-ACR

7 Ivo Slits, AT/MCS-IC, 08.11.20067 Flowdiagram interconnections cryogenic extensions

8 Ivo Slits, AT/MCS-IC, 08.11.20068 Status Note: QRLXA and QRLXC are not accessible due to electrical tests and cabling QRLXJ, QRLXK, QRLXL -> QRL not released in sector 1-2

9 Ivo Slits, AT/MCS-IC, 08.11.20069 DSL (superconducting link) DSLA (1L)

10 Ivo Slits, AT/MCS-IC, 08.11.200610 DSLC (point 3) Interconnections: 2x interne dans la DSLC 1x avec DFBLC 1x avec DFBAF

11 Ivo Slits, AT/MCS-IC, 08.11.200611 Drawing Q5/Q6-DSL

12 Ivo Slits, AT/MCS-IC, 08.11.200612 Drawing Q4-DSL

13 Ivo Slits, AT/MCS-IC, 08.11.200613 Drawing DFBL%-DSL (%=A,B,D,E) Réalisation de plan en cours 12 x 600A

14 Ivo Slits, AT/MCS-IC, 08.11.200614 Drawing DFBL% (internally) - DSL (%=A,B,D,E) 9x 6kA 2x 4kA

15 Ivo Slits, AT/MCS-IC, 08.11.200615 Drawing DSLC internally 48x 600A Note: feedthrough for voltage taps to add

16 Ivo Slits, AT/MCS-IC, 08.11.200616 Drawing DSLC - DFBLC

17 Ivo Slits, AT/MCS-IC, 08.11.200617 Activities AT-MCS Interconnection drawings (support TS-MME); Procurement of interconnection components (sleeves, flanges, MLI, electrical insulation) except for plug (supply AT-ACR); Procurement tooling; Realisation of DSL interconnections with magnets/DFBs in the tunnel.

18 Ivo Slits, AT/MCS-IC, 08.11.200618 Activities in the tunnel

19 Ivo Slits, AT/MCS-IC, 08.11.200619 1)Interference with supports of vacuum chambers -> AT-VAC will do modifications 2)Support for DSL- flexible that will be fixed to the support of the vacuum chambers (AT-MCS) or individual support. 3)VAB supports are adapted to pass the DSL-flexible 4)Interference between DSL flexible and support BPTX at 5R. AB-BI will do the modification. Note: The interconnection DSL/magnet shall be done before the installation of VAB supports and vacuum chambers in the adjacent zone. Integration

20 Ivo Slits, AT/MCS-IC, 08.11.200620 Planning interconnection drawings

21 Ivo Slits, AT/MCS-IC, 08.11.200621 Planning Q6L1-DSL Some delay due to 7-8