Presentation is loading. Please wait.

Presentation is loading. Please wait.

Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October 2015 1 Phil Allport, Matt Baca, Daniel Briglin, James.

Similar presentations


Presentation on theme: "Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October 2015 1 Phil Allport, Matt Baca, Daniel Briglin, James."— Presentation transcript:

1 Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October 2015 1 Phil Allport, Matt Baca, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John Wilson Thermo-mechanical modules in final stage of attaching edge wire-bonds A lot of time spent on module metrology with Mitutoyo Crysta-Apex CMM but difficult to see consistent results measuring from sensor surface to ASIC surface  Many cross-checks and measurements from granite base to sensors and ASICs separately  Marks on sensors and direct force measurements on CMM probe show that touch-contact is too severe for sensor measurement (~500g) In discussion with OGP for order of SmartScope CNC Multi-Sensor Measuring Machine with DRS Laser Package including DRS Laser Adapter and sensor (check specs with others before order)

2 Preparations for Irradiation of ABCN250 hybrids at Birmingham 10 th August 2015, Petal/Stave Meeting Status much as Module Meeting 26 th Oct B'ham workshop has cut one empty V4 panel (from L'pool) into one-hybrid slices using a 'waterjet cutter' machine Simon has clean slices in preparation for wire-bonding. Removing one 'dead' hybrid (no data output, but holds power) to initial wire-bonding tests. When wired-up, do power-tests. Possibly even move into coldbox as a first real test (cool-down to -25C). Can we run without vacuum ? 3D-printed frame to safely hold hybrid on aluminium plate inside irradiation coldbox. Thanks to Luise for sending 3D frame design files from petal module irradiation setup. → Modify them for our hybrid size and print in-house. Somewhat risky to try without this frame (rip-out wires). During silicon sensor irradiation, found quite some noise on single-ended signals from temperature sensors to Arduino (but not humidity sensors) in the coldbox while stage motors are running (15m RS232 cable). May not be a concern for hybrid data cables (LVDS), but be aware and probably consider RJ45 network cables as in testbeam. Strip Module Meeting; 26th October 2015 1 Phil Allport, Matt Baca, Daniel Briglin, James Broughton, Andy Chisholm, Laura Gonella, Kostas Nikolopoulos, Simon Pyatt, Juergen Thomas, John Wilson

3 ABC130 Single-Chip Board: Test system setup 10 th August 2015, Petal/Stave Meeting ABC130Driver ('Cambridge board') at B'ham: Simon has wired-up 16pin Molex connector according to instructions on Twiki 'ABC130SingleChip'. (protective diode was fitted, Xilinx f/w already loaded). Powered-up ABC130Driver (3.3V), adjusted ITSDAQ config, s/w version r3315, communication with Atlys seems ok (Twiki: 'StripsUpgradeABC130Experience') Also received single-chip ABC130 board with mini-sensor fitted from RAL, plan to power-up tomorrow (Any special tricks ? Eg power-up sequence ?) For irradiation of single-chip boards: Prepare long data cable (a la SEU setup Toronto/CERN). Phil and new postgrad Daniel Briglin visiting RichardT at CERN on Monday. Laura joining this program. DAQload: Juergen to visit RAL visit for pick-up next Wed, 11 th Nov, to learn how to run them, wiring details etc. WP3 Meeting; 5 th November 2015 2


Download ppt "Thermo-Mechanical Modules 10 th August 2015, Petal/Stave Meeting Strip Module Meeting; 26th October 2015 1 Phil Allport, Matt Baca, Daniel Briglin, James."

Similar presentations


Ads by Google