Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB
2
Project Introduction FDOT is initiating two separate bridge studies regarding the crossing of Santa Rosa Sound: Brooks Bridge Replacement Study Project Development and Environment (PD&E) Study prior to design phase Santa Rosa Sound Alternate Crossing Study High-level planning and feasibility study to inform decision on advancing to PD&E
3
Then and Now --- The History of Brooks Bridge
1960 1970 1980 1990 2000 2010 1964 ǀ Brooks Bridge Constructed Then and Now --- The History of Brooks Bridge 1990 ǀ Fort Walton Beach Bridge Authority (FWBBA) is established 1992 ǀ FWBBA received funds to study an alternate bridge crossing 1994 ǀ FWBBA Dissolves 2001 ǀ Emerald Coast Bridge Authority (ECBA) is established 2003 ǀ ECBA Initiates a Study to Evaluate an Alternative Bridge Crossing 2006 ǀ ECBA Discontinues Further Study 2014 ǀ Brooks Bridge Surpasses 50 years 2015 ǀ FDOT Initiates Bridge Studies
4
Brooks Bridge Replacement Study – Project Location Map
Change picture
5
Purpose and Need What is the Purpose of the Study?
Identify the best solution and location for replacement of the existing Brooks Bridge and secure federal approvals Why is the Project Needed? Structurally deficient Does not meet current design standards Does not meet Americans with Disabilities Act (ADA) pedestrian / bike requirements
6
Brooks Bridge Replacement Study – Project Process and Schedule
2015 2016 2017 2018 1 2 3 4 5 6 7 8 Project Initiation Environmental & Engineering Data Collection Public Kickoff Meeting Alignment / Bridge Analysis Alternatives Public Workshop Environmental & Engineering Documents Final FHWA Project Approval Alternatives Analysis Public Hearing Feb Apr July Jan Jun Jan Feb July Community Outreach A continuous community outreach process is integrated into every step of the project to ensure that the corridor residents, businesses, the traveling public and other interested parties have meaningful participation in the process. Overall 48 month schedule
7
PD&E Study Activities Evaluate the current conditions
Identify alternatives / perform preliminary engineering analysis Evaluate potential impacts (social, natural & physical) Coordinate with federal, state and local agencies Involve the public in the development of the project
8
Santa Rosa Sound Corridor Alternative Study – Project Vicinity Map
Change picture
9
Purpose and Need What is the Purpose of the Study?
Evaluate the feasibility for a potential alternate crossing of the Santa Rosa Sound Develop the information needed to decide whether to proceed to the PD&E phase Why is the Project Needed? An additional crossing is being considered as a means to relieving regional traffic congestion
10
Santa Rosa Sound Corridor Alternative Study – Project Process and Schedule
2015 2016 2017 1 2 3 4 5 6 7 8 Project Initiation Environmental & Engineering Data Collection Public Kickoff Meeting Prepare Final Feasibility Report Develop and Evaluate Corridors Traffic & Typical Section Analysis Public Corridor Workshop Corridor Refinement & Analysis FDOT Decision on Next Steps Feb Apr June Feb Aug Oct Dec Feb Community Outreach A continuous community outreach process is integrated into every step of the project to ensure that the corridor residents, businesses, the traveling public and other interested parties have meaningful participation in the process. Overall 24 month schedule
11
Corridor Study Activities
Evaluate the current conditions Identify potential corridors Evaluate the feasibility of a potential new crossing (need, engineering, environmental, economic, and travel efficiency) Involve the public in the development of the project
12
Stay Involved Public Kick-off Meeting: Date: Time: Location:
Thursday, April 23, 2015 Time: 5:30 - 6:30 p.m. Presentation at 5:45 p.m. Location: Emerald Coast Convention Center 1250 Miracle Strip Pkwy SE, Fort Walton Beach, Florida 32548 Can’t attend the meeting? Join us online starting April 23, 2015 by visiting:
13
Contact Us Contact Information: Project Manager April Williams, PE FDOT District 3 1074 Highway 90 Chipley, FL 32428 (888) , ext. 1625 Public Information Director Ian Satter (888) , ext. 1205 Consultant Project Manager Steve Schnell, AICP 200 W Forsyth Street Suite 800 Jacksonville, FL (904) Stay Involved: Follow us on Us: and