Presentation is loading. Please wait.

Presentation is loading. Please wait.

TBWG 10/23/06 Transport Canada/Turnpike Border Wait Time Measurement System Operational Status Report Presentation to Canada/U.S. Transportation Border.

Similar presentations


Presentation on theme: "TBWG 10/23/06 Transport Canada/Turnpike Border Wait Time Measurement System Operational Status Report Presentation to Canada/U.S. Transportation Border."— Presentation transcript:

1 TBWG 10/23/06 Transport Canada/Turnpike Border Wait Time Measurement System Operational Status Report Presentation to Canada/U.S. Transportation Border Working Group Niagara Falls, Ontario October 23, 2006

2 TBWG 10/23/06 BWT Measurement: System Development Context  Technology Set : GPS Tracking, ECM Integration & Bluetooth Transmission Precision Functionality Low cost transmission Speed of processing  Real Time Data Management Download, process and post (< 4 minute lag time) Consistent and reliable data products Operator interactive Browser accessible  Private Public Partnership: Carriers, BTOA, OTA/CTA, TC-Ontario, Turnpike Global Technologies A Coalition of Mutual Interest

3 TBWG 10/23/06 BWT Measurement System: Operational Status and Data Summary

4 TBWG 10/23/06 Border Wait Time Website Display Features & Functionality

5 TBWG 10/23/06 BWT Measurement System – Real Time Activity Report BWT Measurement System - Graphic Display

6 TBWG 10/23/06 BWT System Dashboard Display

7 TBWG 10/23/06 Border Wait Time Measurement System Data Products (Examples: March – September ’06)

8 TBWG 10/23/06

9

10

11

12 Peace Bridge (U.S. Bound): ACE Roll-Out (Sample Data)

13 TBWG 10/23/06 Peace Bridge (U.S. Bound): ACE Roll-Out (Sample Data)

14 TBWG 10/23/06


Download ppt "TBWG 10/23/06 Transport Canada/Turnpike Border Wait Time Measurement System Operational Status Report Presentation to Canada/U.S. Transportation Border."

Similar presentations


Ads by Google