Download presentation
Presentation is loading. Please wait.
Published byJessica Crawford Modified over 9 years ago
1
TBWG 10/23/06 Transport Canada/Turnpike Border Wait Time Measurement System Operational Status Report Presentation to Canada/U.S. Transportation Border Working Group Niagara Falls, Ontario October 23, 2006
2
TBWG 10/23/06 BWT Measurement: System Development Context Technology Set : GPS Tracking, ECM Integration & Bluetooth Transmission Precision Functionality Low cost transmission Speed of processing Real Time Data Management Download, process and post (< 4 minute lag time) Consistent and reliable data products Operator interactive Browser accessible Private Public Partnership: Carriers, BTOA, OTA/CTA, TC-Ontario, Turnpike Global Technologies A Coalition of Mutual Interest
3
TBWG 10/23/06 BWT Measurement System: Operational Status and Data Summary
4
TBWG 10/23/06 Border Wait Time Website Display Features & Functionality
5
TBWG 10/23/06 BWT Measurement System – Real Time Activity Report BWT Measurement System - Graphic Display
6
TBWG 10/23/06 BWT System Dashboard Display
7
TBWG 10/23/06 Border Wait Time Measurement System Data Products (Examples: March – September ’06)
8
TBWG 10/23/06
12
Peace Bridge (U.S. Bound): ACE Roll-Out (Sample Data)
13
TBWG 10/23/06 Peace Bridge (U.S. Bound): ACE Roll-Out (Sample Data)
14
TBWG 10/23/06
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.