Download presentation
Presentation is loading. Please wait.
Published byClementine Fisher Modified over 9 years ago
1
ADW System ADW820 - ADW821 NEW 04-16-2010 REVISED (JCL) DESCRIPTION: SCHID 2: Runs on the night before Payroll Calc for MARRG2 payroll. SCHID 4: Runs on the night before Payroll Calc for JULRG2 payroll. DESCRIPTION: SCHID: SCHID: 2, 4 SCHID: CALENDAR: PW CALENDAR CALENDAR: 07-25-1994 DESCRIPTION: SCHID: CALENDAR: ADW820 ADW821 (JCL) (PER840) DESCRIPTION: Triggered by ADW828 Marked for obsoletion, no longer being used by Campus Directory
2
ADW System ADW826 - ADW832 NEW 05-18-2011 REVISED DESCRIPTION: SCHID 2: Runs 2 days after Payroll Calc for SEPRG1 payroll. Marked for Obsoletion DESCRIPTION: SCHID 1: Runs daily, Monday - Sunday. DESCRIPTION: Schid 2: Runs day following 10th day for spring and fall semesters. DESCRIPTION: SCHID 2: Runs the early morning of the day after Payroll calc for SEPRG1 payroll. DESCRIPTION: SCHID 2: Runs every day except Monday. SCHID 3: Runs the 1 st Monday of every month. SCHID 4: Runs every Monday except the first Monday of Every month. SCHID: 2 SCHID: 1 SCHID: 2 SCHID: SCHID: 2,3,4 CALENDAR: PW CALENDAR: 7D CALENDAR: RG CALENDAR: PW, ROLL= N CALENDAR: CALENDAR: 7D, Roll = N 07-25-1994 DESCRIPTION: SCHID: CALENDAR: ADW828 ADW826 ADW827 (USR RQMT: TECH) Has Approval Memo been received? ADW821 (HEPDDONE) (/ADABUTIL) SCHID: 2 ADW830 ADW829 (/PER841) DESCRIPTION: SCHID 2: Runs Sunday through Monday SCHID: 2 CALENDAR: 7D, Roll=D ADW832
3
ADW System ADW840EX - ADWnnn NEW REVISED DESCRIPTION: SCHID 2: Runs Sunday through Monday. DESCRIPTION:. DESCRIPTION: SCHID: 2 SCHID: CALENDAR: 7D, Roll=N CALENDAR: 08-29-2008 DESCRIPTION: SCHID: CALENDAR: ADW840EX SCHID: DESCRIPTION: SCHID: CALENDAR: SCHID: DESCRIPTION:
4
CALENDAR: 7D, ROLL = N SCHID: 2 DESCRIPTION: SCHID 2: Runs Monday through Sunday. ADW850EX CALENDAR: 7D, ROLL = N SCHID: 2 DESCRIPTION: SCHID 2: Runs Monday through Sunday. ADW851EX ADW852EX CALENDAR: 7D, ROLL = N SCHID: 2 DESCRIPTION: SCHID 2: Runs Monday through Sunday. NOTE: This job is set to run every 60 minutes based on the initial time of 0015 (i.e. 15 minutes after midnight). CALENDAR: 7D, ROLL = N SCHID: 2 DESCRIPTION: SCHID 2 runs the first calendar day of every month. CALENDAR: 7D, ROLL = N SCHID: 2 DESCRIPTION: Runs the first day of May. CALENDAR: SCHID: DESCRIPTION: CALENDAR: SCHID: DESCRIPTION: CALENDAR: SCHID: DESCRIPTION: ADW System ADW850EX – ADW854EX 10-20-2008 NEW 05-01-2013 REVISED ADW853EX ADW854EX (SBTM: 0200) OBSOLETE 5/1/2013 per Jay/John
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.