Download presentation
Presentation is loading. Please wait.
Published byBuck Rodgers Modified over 8 years ago
1
Creating Positive Cashflow Properties -Anatomy of a makeover http://www.themakeovergroup.com.au/
2
Why makeover a rental property? Targeted spending can improve the overall investment return (both cashflow & capital value) This reduces the shortfall between rent paid by the tenants and interest costs Importantly, it improves an investors position to acquire their next property http://www.themakeovergroup.com.au/
3
A case study Making over Hotham St, Ballarat http://www.themakeovergroup..com.au/
4
Background - Purchase price: $198k - Existing rent: $160 per week (4.2% yield) - Condition: Very poor, house appeared to be leaning, smoke stained walls and ceilings, old/stained carpets, brown wall paper and paneling. - Locale: 150 m to Lake Wendoree, 800m to city, 500m to hospitals http://www.themakeovergroup. com.au/
5
The Makeover Straighten front porch post (house wasn’t leaning at all!) Paint internal and external New floor coverings & light fittings Update bathroom (cosmetic only) and kitchen (2ndhand) Simple landscaping & heaters in rooms Timeframe: two weeks (some work before settlement) Budget: $19,000 http://www.themakeovergroup. com.au/
6
Before and after photos http://www.themakeovergroup.com.au/ Before After Before After Secondhand kitchen Cost: $3,400 installed
7
The Numbers BeforeAfter Rent$160 pw$245 pw Yield4.2%5.9% Value$198,000$260,000 LVR93%74% Equity$14,000$57,000 http://www.themakeovergroup. com.au/
8
What the client said: “Making over Hotham St. completely changed how attractive the property was as an investment. Not only did we improve the yield by almost two percent, but we also added about $60,000 of value – all for a $19,000 investment. This meant our LVR was even stronger than it was before we bought the house, putting us in a stronger position for our next purchase with the bank.” C. Kingston http://www.themakeovergroup. com.au/
9
Risks for makeovers Sourcing reliable tradespeople Time blowouts (leading to lost rent) Insufficient research/analysis Cost blowouts (selective enhancements) Structural integrity, unidentified works required Asbestos http://www.themakeovergroup. com.au/
10
Some of our other projects http://www.themakeovergroup. com.au/ To find out more, contact Richard on 1300 768 949
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.