Download presentation
Presentation is loading. Please wait.
Published byBarnard Warren Modified over 8 years ago
1
Replacement of Any Read – Initial views
2
2 Assumptions Can’t re-open NDM Allocation or Energy Balancing after D+5 Can’t go back to a read before prevailing Line-in-the- Sand date
3
3 Impacts on NDM Reads READ 1READ 2 READ 3 VOLUME 1 VOLUME 2 Replaced Read New Volume 1 New Reconciliation 1 New Volume 2 New Reconciliation 2 New Filter Failure? New Filter Failure? NOTE: If Read 2 = Opening Read, need prior Shipper agreement to change this read Cancel any outstanding Filter Failures
4
4 Impacts on NDM AQs READ 1READ 2 READ 3 VOLUME 1 If Replaced Read was used as start or end read for current or previous AQ … Replaced Read Revised AQ New Volume 1 Historic data invalidated, e.g. MRF? Revised Capacity Charges and Commodity Transportation Rates NOTE: Could impact a previous Shipper’s AQ and charges VOLUME 2 Historic charges invalidated, e.g. Must reads? SHIPPER A SHIPPER A or SHIPPER B NOTE: No filter mechanism for erroneous charges Need to review historic charges, e.g. Mod 640 Threshold Crossers?
5
5 Impact of Change of Read outside of Ownership Shipper may initiate change prior to or after their ownership Other Shipper(s) volume amended Other Shipper(s) approval required to amend volumes? Can other Shipper change the volume back if they disagree? Could lead to “yo-yoing” changes Should the number of changes be limited?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.