Download presentation
Presentation is loading. Please wait.
Published byHenry Gibbs Modified over 9 years ago
1
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab New kappa not yet in operation
2
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab
3
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction
4
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat
5
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-4 SAXS station Under commissioning
6
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-4 SAXS station Under commissioning I911-5 MX station Single-axis goniostat New monochromator
7
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-1 Diffraction station Under reconstruction I911-2 MX station Single-axis goniostat I911-4 SAXS station Under commissioning I911-5 MX station Single-axis goniostat New monochromator I911-3 Tunable MX station Mini-kappa MK3
8
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-3: Experiment station completely rebuilt March-May 2010 (new hutch, new experiment tables, new goniostat,...) Users during June 2010 Sample changer installation October 2010
9
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab
10
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab
11
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab
12
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab I911-3: Control software: spec and mxCuBE mini-kappa MK3: not yet used
13
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab MAX IV New facility replacing the present MAX I, MAX II & MAX III storage rings (and the present FEL test facility) Consisting of: - 1.5 GeV ring (96 m circumference, 6 nm rad) - 3 GeV ring (530 m circumference, 0.3 nm rad, 19 straight sections available) - a short pulse facility that could be extended with a FEL
14
Thomas UrsbyKappa meeting, EMBL, Grenoble, 20th September 2010 Status Report MAX-lab MAX IV Funding available for buildings and accelerator... but not for the beamlines We hope to have funding for 7 beamlines this autumn including a microfocus MX beamline and possibly a high-throughput MX beamline.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.