Presentation is loading. Please wait.

Presentation is loading. Please wait.

The problem: what risk was been addressed The objective.

Similar presentations


Presentation on theme: "The problem: what risk was been addressed The objective."— Presentation transcript:

1

2 The problem: what risk was been addressed

3 The objective

4 Methodology & Implementation

5 What risk was this approach addressing?

6 Who were the target groups of the project?

7 Who were the key stakeholders of the project and what methods were used to involve them

8 What were the replicability potential of the project

9 Where the action took place & what was done ( the solution)

10 How did this ecosystem approach address climate change & enhance ecosystem productivity, improve food security, clean energy/water, and transport

11 Emerging opportunities

12 Replication and up-scaling potential

13 How did the project addressed sustainability and cross-cutting issues

14 What should be considered in up-scaling ecosystem based approaches

15 What are the current limitations in the use of ecosystem approaches

16 what are the scientific limitations


Download ppt "The problem: what risk was been addressed The objective."

Similar presentations


Ads by Google