2014/3/25TTC Meeting 2014@DESY1 Beam Operation Experience at Quantum Beam Project in STF Kirk
2
2014/3/25TTC Meeting 2014@DESY2 No change during “beam” operation in KEK-STF even after many earthquakes!! The answer is… MHI-12 and -13 were very stable in Quantum beam experiment
3
2014/3/25TTC Meeting 2014@DESY3 We have a few examples for change in Cryomodule test But….
4
superconducting rf test facility History of Cavity Performance in KEK-STF Vertical Test in CW mode Cryomodule Test in Pulsed mode
5
5STF Cavity Group Meeting (2013/5/13) Status of RF Conditioning for MHI-12 600μsec 1500μsec
6
6STF Cavity Group Meeting (2013/5/13) Status of RF Conditioning for MHI-12 1500μsec
7
7STF Cavity Group Meeting (2013/5/13) Status of RF Conditioning for MHI-12 600μsec 1500μsec
8
8STF Cavity Group Meeting (2013/5/13) Status of RF Conditioning for MHI-12 1500μsec
9
Comparison of Radiation Level History MHI-12MHI-13 The radiation level was never changed during the CM test.
10
2014/3/25TTC Meeting 2014@DESY10 Cavity performance degraded by “Earthquake” during beam operation?
11
2014/3/25TTC Meeting 2014@DESY11 dateTimeLevelOperation status Detuning direction MHI-12MHI-13 12/Oct/201213:573 Beam Tuning [RF @Cavity = ON] -- 24/Oct/201216:052 Beam Tuning [RF @Cavity = ON] -+ 31/Oct/201215:502 Beam Tuning [RF @cavity = 30sec. ON ⇒ RF Off (manually)] -+ 7/Dec/201217:184 LLRF study [RF @Cavity = 60sec. ON ⇒ LV Off (I/L)] -+ Earthquake events at KEK-STF
12
2014/3/25TTC Meeting 2014@DESY12 Log Trend in 12/Oct/2012 MHI-12MHI-13
13
2014/3/25TTC Meeting 2014@DESY13 Log Trend in 24/Oct/2012 MHI-12MHI-13
14
2014/3/25TTC Meeting 2014@DESY14 Log Trend in 31/Oct/2012 MHI-12MHI-13
15
2014/3/25TTC Meeting 2014@DESY15 Log Trend in 7/Dec/2012 MHI-12MHI-13
16
2014/3/25TTC Meeting 2014@DESY16 After these earthquakes, the cavity performance was never changed!!
17
Cavity Performance for STF-2 2014/3/25TTC Meeting 2014@DESY17
18
In future… The high power test in STF-2 will start from 2015. 2014/3/25TTC Meeting 2014@DESY18