© Property of ERCOT 2004 1 EMMS Improvements Operations Review Group 11/17/04
2
© Property of ERCOT 2004 2 Coming Improvements Dynamic Ratings (beginning February 2005) Remote Study Cases (Mid February 2005) Release 4A Implementation (End May 2005) RAP-C Enhancements (In Planning) SCADA/SE Performance Monitoring (In Planning) Outage Scheduler Phase II (In Planning)
3
© Property of ERCOT 2004 3 Dynamic Ratings This project will allow ERCOT to maintain “dynamic” line ratings that take into account real-time ambient temperature, adjusting a given line’s rating up or down, as appropriate. This will allow additional capacity across those lines during cooler ambient temperature conditions, greatly benefiting market participants by reducing congestion costs. (increasing market efficiency)
4
© Property of ERCOT 2004 4 Remote Access to Study Cases The solution will allow TSPs to remotely and securely access STNET network study cases in the EMS component of the Market Operations Testing Environment (MOTE). Clones will exist for each TSP. TSPs will thus be able to work in conjunction with ERCOT modeling engineers to tune the network model, enhancing its efficiency.
5
© Property of ERCOT 2004 5 Release 4 RPRS improvements Optimizes across entire day; eliminate boundary problems between hours Provides Generic bids for non-bid resources Distinguish Operational constraints versus zonal constraints and apply different pricing BES offers associated with RPRS capacity verified Automated multi-step RPRS (Allows operator to over-ride solution and deselect units)
6
© Property of ERCOT 2004 6 Release 4 Enhancement to OOM tools Allows operator to enter in summary mode: Can modify and existing OOM which has not deployed Can issue fleet deployments (PRR 422) Business tracking of VDI’s & electronic transfer Can retract an OOM which has not started Display enhancement’s: shows SCADA/instructed levels Allows OOM below minimum operating level to QF’s only via VDI
7
© Property of ERCOT 2004 7 Release 4 Improve Data Elements for Local Constraints Forces standardization of naming convention In OOM tool select from a list of OC2 & OC3’s Currently SPD does not include OOM’d units in AS. This changes SPD to allow inclusion of OOM units in AS.
8
© Property of ERCOT 2004 8 RAP-C Modeling Enhancements This project was created to solve the problem of proposed Remedial Action Plans which are not always valid. This project will provide Operators with displays explaining what conditions are required before depending upon a “conditional” Remedial Action Plan, and a method of determining if these conditions allow use of the RAP This is expected to reduce transmission congestion through enhanced market efficiencies.
9
© Property of ERCOT 2004 9 SCADA/SE Performance Monitoring SE currently provides limited summary and diagnostic information. The solution accuracy is limited due to the lack of any performance monitoring tools. This project will provide performance measurements and tracking which will allow effective management of our State Estimator support. The project is expected to improve solution accuracy provided by SE through improved targeting of personnel in detecting, and correcting bad input parameters to SE.
10
© Property of ERCOT 2004 10 Outage Scheduler Enhancements Phase II Project required for compliance with PRR425. Changes to Outage Scheduler application include: Implementing performance metrics. Adding version tracking for outage updates. Adding sort capabilities and increasing notes capacity. Adding ability to disable an active, approved & continuous outage for a selected time period. Creating new roles that allow different privileges. Developing an electronic form for the TSP to fill out when a New, Relocated, Temporary Re-Route “In-Service” goes into service.