Presentation is loading. Please wait.

Presentation is loading. Please wait.

Introducing SMILER 1. Why SMILER? Monitoring as the ‘poor relation’ Disconnect between proposal and report contents Projects just not delivering Limited.

Similar presentations


Presentation on theme: "Introducing SMILER 1. Why SMILER? Monitoring as the ‘poor relation’ Disconnect between proposal and report contents Projects just not delivering Limited."— Presentation transcript:

1 Introducing SMILER 1

2 Why SMILER? Monitoring as the ‘poor relation’ Disconnect between proposal and report contents Projects just not delivering Limited understanding of what M&E involves 2

3 Helping staff

4 SMILER Simple Measurement of Indicators and Learning from Evidence-based Reports 4

5 5 What is SMILER?

6 Example: Data Flow Map

7 7

8 SMILER Coaching Process One week Product driven 5 -6 selected staff M&E Technical Managers 8

9 SMILER Coaching Products Draft M&E Operating manual Enthusiastic staff Plan to finalize and test the system 9

10 Hot Tips Design M&E system early Use all SMILER components Review and finalize with other project and partner staff Develop communication and training plan Review implementation at 6 month mark

11 ITT Partner reporting tool One form for quantitative data –IPTT indicators – regular monitoring –DIP indicators –Technical indicators –Management indicators 11

12 Effectiveness Anecdotal - used extensively by Africa regions 6 month reviews Malawi WALA case study 12

13 13 http://www.crsprogramquality.org/publications/tag/propack English French Spanish Any Questions?


Download ppt "Introducing SMILER 1. Why SMILER? Monitoring as the ‘poor relation’ Disconnect between proposal and report contents Projects just not delivering Limited."

Similar presentations


Ads by Google